Message ID: 613
Entry time: Tue May 30 00:58:10 2017
|
Author: |
TD, CB |
Subject: |
Tuesday 30 May - day shift |
|
|
08.58 DAQ continues OK
File RIBF127R1/R1_99
BigRIPS run 1009
BRIKEN run 9
BNC PB-4
Amplitude 90,000
x5 attenuator IN
t_r 100ns tau_d 50us
- polarity
frequency 25Hz range
delay MIN, tail pulse, INT ref
ASIC settings 2017Mar27-16.12.39
08.59 *online* analysis - ADC & disc data synchronised - see attachment 1
analysis of R1_99 OK - see attachment 2 - deadtime <0.5%
09.11 BigRIPS & BRIKEN DAQ stop
09.13 AIDA RIBF127R1/R1_103
BRIKEN 10
BigRIPS 1010
Fixed Degrader in place 13m Al (8mm + 3mm + 2mm Plates)
Variable degraders
1mm Al - in
1mm Al - in
1mm Al - out
09.30 Detector biases; leakage currents OK - see attachments 3 & 4
FEE64 Temperatures OK - see attachment 5
good events; statistics OK - see attachment 6
No warnings/errors reported by merger since DAQ GO - see attachment 7
*all* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (status=6)
09.50 layout 1-8 spectra - see attachments 8-17
Note pulser amplitude drifting for + polarity
*all* spectra zero'd
10.00 BigRIPS & BRIKEN DAQ stop
AIDA RIBF127R1/R1_114
Check ASIC control x2
10.03 AIDA RIBF127R1/R1_115
DAQ start BRIKEN 11
DAQ start BigRIPS 1011
11.12 Changing degraders (16 mm Al plate check?)
E17/F11 ambient temperature +24.7 deg C, RH 38.7%, d.p. +9.7 deg C
Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level OK (c. 70%)
HEC plot attached - see attach 8
11.17 AIDA RIBF127R1/R1_132
DAQ start BRIKEN 12
DAQ start BigRIPS 1012
Attempted to start new run. Lost beam. BigRIPS re-optimising
11.40 Found beam
Zero'd all histograms
Cleared online sorting histograms
AIDA RIBF127R1/R1_139
DAQ start BRIKEN 13
DAQ start BigRIPS 1013
12.14 Machine is down on AIDA run RIBF127R1/R1_145
HEC plot attached - see attach 9
Implants moved one detector upstream
12.24 Check ASIC Control x2
12.30 Beam back
12.31 AIDA RIBF127R1/R1_149
DAQ start BRIKEN 14
DAQ start BigRIPS 1014
12.35 Detector biases; leakage currents OK - see attachments 22 & 23
*online* analysis - ADC & disc data synchronised
analysis of R1_149 OK - see attachment 24 - deadtime <0.5%
12.39 Beam off RIBF127R1/R1_151
SRC cooling issues
13.55 Background run
AIDA RIBF127R1/R1_170
DAQ start BRIKEN 15, BigRIPS 1015
14.01 Beam still off
14.20 Stop background run
AIDA RIBF127R1/R1_175
15.30 Beam still off
DAQ continues OK
FEE64 temperatures OK - attach 24
Statistics OK - attach 25
Leakage currents OK - attach 26
No merger errors. No nnaida panics from USB console terminal.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|