AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:36:48 2025
Author
*
:
Subject
*
:
7 June 2017 00:05 All system-wide checks are passed Sync pulses nera 44 x 10^6 Memory 35k ~ 38k Biases uploaded as 33.png, 34.png - attachments 1 & 2 Entered into spreadsheet SSD 3 bias is going up slowly since this isotope setting began Around "2 to 4" Hz in SSDs 3 and 4 -> 50 to 80 pps implant rate See attachment 3, 35.png All rates under 100k except nnaida 13, 21 See attachment 4, 36.png FEE temperatures shown as 37.png, attachment #5 00:30 BRIKEN number 32, AIDA R6_299, BigRIPS 3032 01:01 Timewarps look okay (only 2 MBS seen in FEE 6) See R6_307 - attachment #6 01:30 BRIKEN and BigRIPS runs stopped. AIDA R6_317 at that time. 01:31 AIDA R6_318, BRIKEN run #33, BigRIPS #3033 All system-wide checks passed. SYNC pulses 46 x 10^6 Memory 35 ~ 39k 02:08 Biases shown as 38.png, attachment #7 02:34 AIDA run R6_337 when BRIKEN and BigRIPS runs are stopped. AIDA passes all system-wide checks. 02:37 AIDA just begins R6_338l. BRIKEN run #34, BigRIPS #3034 Timewarps look okay, see attachment #8, R6_336 Statistics consistent, see attachment #9, 39.png Implant rate around 75 cps 03:31 AIDA run R6_354 at the stop of BRIKEN and BigRIPS runs 03:34 AIDA R6_355, BRIKEN run #35, BigRIPS #3035 AIDA passed all system checks. Merger shows low rate for nnaida8, but this is consistent for tonight. 4:03 Biases shown as 40.png, attachment #10. 4:08 Stats shown as 41.png, attachment #11 As before, only nnaida13 and nnaida21 show over 100k, and nnaida8 is quite low. 4:30 AIDA run R6_372 at the close of BRIKEN and BigRIPS runs. 4:32 AIDA R6_373 with new BRIKEN run #36 and BigRIPS #3036. All system-wide checks okay. 5:38 AIDA R6_393 at the stop of BRIKEN and BigRIPS runs All system-wide checks okay. 5:39 AIDA still R6_393, BRIKEN run #37 and BigRIPS run #3037 6:00 Leak currents shown as 42.png, attachment #12 6:16 Beam stopped so we can check the signal of one Ge detector that became noisy R6_404 at that time Added some Al foil to the Ge signal cables 6:28 Beam is back R6_408 6:29 BRIKEN run #41, BigRIPS #38 7:28 AIDA R6_426 at stop of other runs System-wide checks are okay. 7:30 AIDA R6_427. BRIKEN #42, BigRIPS #39 Implant rates 60 ~ 70 cps in AIDA One MBS timewarp in R6_426, as attachment #13 7:57 Leak currents shown as attachment #14, 43.png
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown