AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:35:35 2025
Author
*
:
Subject
*
:
08:54 DAQ still running 09:01 BRIKEN and BigRIPS stop daqs AIDA on file R7_293 Beam stopped 09:25 System wide checks ok Bias and leakage ok - attachment 1 Good event statistics - attachment 2 FEE temperatures - attachment 3 13:36 Beam about to be back Briken on Run 65 (Background) AIDA on file 350 13:37 Beam is returned BRIKEN starts run 66 bigRIPS run 3069 AIDA on file R7_350 System wide checks ok 13:40 Bias and leakage ok - attachment 4 Good event - attachment 5 FEE temperatures - attachment 6 14:00 Beam down originally five minutes 14:08 Beam will be down for another 20 minutes BRIKEN and BigRIPS stop daqs AIDA on file R7_356 14:22 beam is back 14:23 BigRIPS starts run 3070 Briken starts run 67 AIDA on file R7_360 15.23 DAQ stop AIDA file RIBF128/R7_373 15:26 BigRIPS starts run 3071 Briken starts run 68 AIDA on file R7_374 15.29 beam off - back in 5 mins AIDA file RIBF128/R7_374 15.44 beam back AIDA file RIBF128/R7_377
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown