AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:18:17 2025
Author
*
:
Subject
*
:
> 08:54 DAQ still running > > 09:01 BRIKEN and BigRIPS stop daqs > AIDA on file R7_293 > Beam stopped > > 09:25 System wide checks ok > Bias and leakage ok - attachment 1 > Good event statistics - attachment 2 > FEE temperatures - attachment 3 > > 13:36 Beam about to be back > Briken on Run 65 (Background) > AIDA on file 350 > > 13:37 Beam is returned > BRIKEN starts run 66 > bigRIPS run 3069 > AIDA on file R7_350 > System wide checks ok > > 13:40 Bias and leakage ok - attachment 4 > Good event - attachment 5 > FEE temperatures - attachment 6 > > 14:00 Beam down originally five minutes > > 14:08 Beam will be down for another 20 minutes > BRIKEN and BigRIPS stop daqs > AIDA on file R7_356 > > 14:22 beam is back > > 14:23 BigRIPS starts run 3070 > Briken starts run 67 > AIDA on file R7_360 > > 15.23 DAQ stop > AIDA file RIBF128/R7_373 > > 15:26 BigRIPS starts run 3071 > Briken starts run 68 > AIDA on file R7_374 > > 15.29 beam off - back in 5 mins > AIDA file RIBF128/R7_374 > > 15.44 beam back > AIDA file RIBF128/R7_377 >
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown