AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:35:41 2025
Author
*
:
Subject
*
:
00:06 System wide checks all ok Bias and leakage currents ok - attachment 1 Good event statistics - attachment 2 FEE temperatures - attachment 3 00:29 BRIKEN and BigRIPS stop their DAQs AIDA on file R7_494 00:31 BigRIPS starts run 3080 BRIKEN starts run 77 AIDA on file R7_494 01:31 BigRIPS and BRIKEN stop DAQs AIDA on file R7_508 01:33 BRIKEN starts run 78 BigRIPS starts run 3081 AIDA on file R7_508 02:10 System wide checks all ok Bias and leakage ok - attachment 4 Good event statistics - attachment 5 FEE temperatures - attachment 6 02:30 BRIKEN and BigRIPS stop their DAQs AIDA on file R7_211 02:32 BigRIPs started Run 3082 BigRIPS stopped 02:33 Beam stopped to put and extra 1mm of degrader in to shift beam Current degrader settings: F7 = 2mm Al F11 = 4.5mm Al 02:39 biGRIPS starts run 3083 BRIKEN starts run 79 AIDA on file R7_523 DSSD rates from R7_235 *** DSSSD # 1 count: 119355 old count: 78874 dt: 1.05 s LEC rate: 38696.78 Hz *** DSSSD # 2 count: 188044 old count: 124828 dt: 1.05 s LEC rate: 60429.72 Hz *** DSSSD # 3 count: 53151 old count: 34736 dt: 1.05 s LEC rate: 17603.35 Hz *** DSSSD # 4 count: 61647 old count: 40919 dt: 1.05 s LEC rate: 19814.40 Hz *** DSSSD # 5 count: 14623 old count: 9739 dt: 1.05 s LEC rate: 4668.74 Hz *** DSSSD # 6 count: 41905 old count: 27687 dt: 1.05 s LEC rate: 13591.33 Hz *** DSSSD # 1 count: 1 old count: 1 dt: 1.05 s HEC rate: 0.00 Hz *** DSSSD # 2 count: 11 old count: 7 dt: 1.05 s HEC rate: 3.82 Hz *** DSSSD # 3 count: 19 old count: 10 dt: 1.05 s HEC rate: 8.60 Hz *** DSSSD # 4 count: 15 old count: 10 dt: 1.05 s HEC rate: 4.78 Hz *** DSSSD # 5 count: 0 old count: 0 dt: 1.05 s HEC rate: 0.00 Hz *** DSSSD # 6 count: 3 old count: 2 dt: 1.05 s HEC rate: 0.96 Hz 03:37 bigRIPS and BRIKEN stop their daqs AIDA on file R7_537 03:39 BigRIPS starts run 3084 BRIKEN starts run 80 AIDA on file R7_537 04:16 System wide checks ok Leakage and bias ok - attachment 7 Good events - attachment 8 FEE temperatures - attachment 9 04:33 BRIKEN AND BigRIPS stop daqs AIDA on file R7_549 04:34 BRIKEN starts run 81 BigRIPS starts run 3085 AIDA on file R7_550 05:30 BigRIPS and BRIKEN stop their DAQs AIDA on file R7_563 05:40 bigRIPS starts run 3086 BRIKEN starts run 82 AIDA on R7_565 06:14 System wide checks all ok Bias and leakages ok - attachment 10 Good events - attachment 11 FEE temperatures - attachment 12 06:33 BigRIPS and BRIKEN stop their DAQs AIDA on file R7_577 06:34 BigRIPS starts run 3087 BRIKEN starts run 83 AIDA on file R7_577 07:30 BRIKEN and BigRIPS stop daqs AIDA on file R7_590 07:31 BigRIPS starts run 3088 BRIKEN starts run 84 AIDA on file R7_591
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown