AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:16:18 2025
Author
*
:
Subject
*
:
> MSL type BB18 > > Serial Thickness Depletion Date Note Location > (um) (V) > > 2933-7 1004 ? 7.11.11 Mechanical Sample Edinburgh > > 2933-13/2933-18/2933-20 1001/1001/990 290/300/340 24.11.11 Mechanical Sample Edinburgh > > 2944-4 1034 RIKEN > 2944-10 1038 RIKEN > 2944-15 1044 Edinburgh > > 2977-6 1004 75 6.6.12 Pre-production series RIKEN > bond wire repair reqd > 2977-7 1010 70 26.7.12 Pre-production series RIKEN > 2977-15 1007 75 26.7.12 Pre-production series RIKEN > 2977-20 1008 70 6.6.12 Pre-production series RIKEN > > > 2998-20 1006 100 21.3.13 Edinburgh > 2998-22 1006 Edinburgh > 2998-23 1012 Edinburgh > > 3058-2 1016 60 17.11.14 Edinburgh > 3058-3 1033 70 10.11.14 Edinburgh > 3058-4 1023 60 7.11.14 Edinburgh > 3058-5 1010 70 23.2.15 Edinburgh > 3058-6 1013 66 12.11.14 Edinburgh > 3058-7 1027 63 10.11.14 Edinburgh > 3058-9 1029 60 11.11.14 RIKEN > 3058-25 1011 115 3.3.15 RIKEN > > 3131-9 925 120 16.2.15 RIKEN > 3131-11 923 80 6.3.15 RIKEN
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown