AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:31:37 2025
Author
*
:
Subject
*
:
<p>23/04/15</p> <p>1800: Spent majority of the day moving AIDA forward and into EURICA.</p> <p> So far everything seems to fit very well, we have just noticed a few points of possible mechanical conflict that should be watched when inserting/removing AIDA into EURICA</p> <ul> <li>Overhead LN2 pipes are lower than the top of the FEE tower. These have been loosely cable tied to some other cables to keep them away from AIDA. Need to make sure they don't move upon filling of LN2</li> <li>Yellow water pipe at front of AIDA may be pinched by EURICA structure upon full closure. Will check first time we close.</li> <li>Horizontal screw at base of nose is the most rearward point of contact and means AIDA cannot be inserted further than this. Already sufficiently far into EURICA so not a problem in that sense.</li> <li>Table itself can be moved to within ~5cm of EURICA structure without disturbing cabling along floor too much or touching rails.</li> <li>Front leg fits easily under EURICA structure.</li> </ul> <p> </p> <p> Due to the number and file size of the photos, I can't upload them here so have made them available at:</p> <p> https://www.dropbox.com/sh/ho1c0ocgc7rjji4/AADNsFZjSi6-Tx5CfxBt1PKUa?dl=0</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown