AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:14:30 2025
Author
*
:
Subject
*
:
> > 09.38 DAQ continues OK > > DAQ stop June18/R5_8 > > Detector biases & leakage currents OK - see attachments 1 & 2 > Ambient temperature +25.3 deg C, d.p. +9.4 deg C, RH 36.4% > FEE64 temperatures OK - see attachment 3 > > System-wide checks OK *except* > nnaida25 failed global clock check code 6 > failed ADC calibration > > Analysis June18/R5_8 - see attachment 4 > > 10.00 *all* slow comparator thresholds 0x64 -> 0xa > BNC PB-4 pulser ON > > per FEE64 1.8.W spectra - 20us & 200us range - see attachments 5-8 > > 14:16 FEE Module nnaida25 & nnaida26 replaced > > nnaida25 2b:09:da -> 2b:09;e7 > nnaida26 2b:11:c5 -> 2b:22:55 > > System-wide checks OK *except* > nnaida21 failed global clock check code 6 > failed ADC calibration > nnaida28 failed global clock check code 6 > failed ADC calibration > 511 > Since replacing histograming has begun working for all FEE64s and rates across detectors seem lower > > Waveforms of FEEs attachments 10 & 11 > ADC Rates - attachment 12 > Good event statistics - attachment 13 > > 14.28 per FEE64 1.8.W spectra - 200us range - see attachments 14 & 15 > > 17:06 Thresholds at 0x64 across all FEEs > Alpha run started R8
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown