AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:37:24 2025
Author
*
:
Subject
*
:
10:18 Bias and leakage currents ok - attachment 1 FEE Temperatures ok System wide checks all ok Currently on file R9_63 Humidity 43.3%, Temperature 25.1C, Dew Point +11.8C Filler level ok 12:51 Bias and leakage currents ok - attachment 2 FEE Temperatures ok System wide checks all ok Currently on file R9_64 19:20 Bias and leakage currents - attachment 3 FEE temperatures ok System wide checks all ok Currently on file R9_65 ASIC 2 is still missing from FEE29. ASIC checks earlier in the afternoon have failed to recover it. - attachment 4 This ASIC has been observed to be working since it was installed last week. Once the alpha run is over further attempts will be made to test it is back.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown