AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:25:54 2025
Author
*
:
Subject
*
:
> 10:18 Bias and leakage currents ok - attachment 1 > FEE Temperatures ok > System wide checks all ok > Currently on file R9_63 > Humidity 43.3%, Temperature 25.1C, Dew Point +11.8C > Filler level ok > > 12:51 Bias and leakage currents ok - attachment 2 > FEE Temperatures ok > System wide checks all ok > Currently on file R9_64 > > 19:20 Bias and leakage currents - attachment 3 > FEE temperatures ok > System wide checks all ok > Currently on file R9_65 > ASIC 2 is still missing from FEE29. ASIC checks earlier in the afternoon have failed to recover it. - > attachment 4 > This ASIC has been observed to be working since it was installed last week. Once the alpha run is over > further attempts > will be made to test it is back.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown