AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:27:58 2025
Author
*
:
Subject
*
:
> R7_0 -> R7_1 High Energy pulser run > R8_0 -> R8_1 Low energy puler run > R9_52 -> R9_62 Alpha run > > On analysing all three runs it appears an ASIC is missing in FEE 29 - attachments 1 - 3 > > This ASIC does not appear to be missing in the alpha run carried out on June 24th - attachment 4 > > I do not believe that this is a broken ASIC. > > I have performed an ASIC check load on the FEE module to try and regain it. I will check the files created since > later to see if it has been regained. > > Using the pulser runs two different sets of offsets were calculated. One using the low energy run and one using > the high energy. > To compare the two different sets of offsets calculated Ex vs Ey plots were created for the first detector. > > Attachment 5 shows these plots on the left is the low energy offsets and on the right the high energy pulser offsets > It can be seen that the grouping is much better with the events being tighter to the y = x line on the run sorted > using the low energy pulser offsets.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown