AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 731     Entry time: Fri Jun 29 02:26:34 2018
Author: OH 
Subject: Friday 29 June 
10:27 Bias and leakage currents ok - attachment 1
      Fee temperatures ok - attachment 2
      Temperature 24.7C, Humdidity 44.5%, D.P +11.8C
      System wide checks all ok
      Currently on file R9_69

      Vandle guys are about to start building. They have been made aware to avoid the power cables for the
chiller and AIDA
      Also of the network cables and HDMI cables.

14:46 Bias and leakage currents ok - attachment 3
      System wide checks all ok
      FEE temperatures all ok
      Currently on R9_70

19:55 Bias and leakage currents ok - attachment 4
      Fee temperatures ok
      System wide checks ok
      
Attachment 1: 180629_1026_bias.png  22 kB  Uploaded Fri Jun 29 03:31:15 2018  | Hide | Hide all
180629_1026_bias.png
Attachment 2: 180629_1028_feetemp.png  129 kB  Uploaded Fri Jun 29 03:31:15 2018  | Hide | Hide all
180629_1028_feetemp.png
Attachment 3: 180629_1445_bias.png  20 kB  Uploaded Fri Jun 29 12:56:05 2018  | Hide | Hide all
180629_1445_bias.png
Attachment 4: 180629_1954_bias.png  19 kB  Uploaded Fri Jun 29 12:56:05 2018  | Hide | Hide all
180629_1954_bias.png
ELOG V3.1.4-unknown