10:23 Bias and leakage currents ok - attachment 1 Fee temperatures ok - attachment 2 System wide checks ok 14:07 Bias and leakage currents ok - attachment 3 FEE temperatures ok System wide checks ok Have been unable to recover ASIC 2 in nnaida29. Have checked removing the detector cabling and can still not recover the ASIC Also noise in DSSD1 and 2 is still high - attachment 4 However in DSSD3-8 it is very good Humidity 44.7%, Temperature 25.5C, D.P +13C 15:57 FEE modules turned off via rly16 DSSD bias removed AIDA has been put in a safe state.