AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 743     Entry time: Sun Sep 30 01:13:47 2018
Author: OH, TD 
Subject: Sunday 30 September 
09.10 DAQ continues OK - current file Sep18/R2_6

09.15 all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biased & leakage currents OK - see attachments 1 & 2


      FEE64 temperatures OK - see attachment 3
      good event statistics OK - see attachment 4
      nnaida2 rate due to one hot channel

      Merger OK - see attachment 5
      TapeServer OK - see attachment 6
      no errors or warnings shown by server terminal sessions 

      1.8.W - 20us FSR - see attachments 7 & 8

      all spectra zeroed
      
16.05 temperature +24.2 deg C, RH 45.4%, d.p. +11.6deg C
      Julabo FL11006 water level c. 75-80% (i.e. approx mid-way between middle and upper level indicators)
Attachment 1: 1.png  12 kB  Uploaded Sun Sep 30 02:27:16 2018  | Hide | Hide all
1.png
Attachment 2: 2.png  12 kB  Uploaded Sun Sep 30 02:27:16 2018  | Hide | Hide all
2.png
Attachment 3: 3.png  142 kB  Uploaded Sun Sep 30 02:27:16 2018  | Hide | Hide all
3.png
Attachment 4: 4.png  90 kB  Uploaded Sun Sep 30 02:27:16 2018  | Hide | Hide all
4.png
Attachment 5: 5.png  102 kB  Uploaded Sun Sep 30 02:27:16 2018  | Hide | Hide all
5.png
Attachment 6: 6.png  102 kB  Uploaded Sun Sep 30 02:27:16 2018  | Hide | Hide all
6.png
Attachment 7: 7.png  152 kB  Uploaded Sun Sep 30 02:27:16 2018  | Hide | Hide all
7.png
Attachment 8: 8.png  153 kB  Uploaded Sun Sep 30 02:28:22 2018  | Hide | Hide all
8.png
ELOG V3.1.4-unknown