AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:36:51 2025
Author
*
:
Subject
*
:
09.10 DAQ continues OK - current file Sep18/R2_16 09.15 all system wide checks OK *except* nnaida7 fails ADC calibration detector biases & leakage currents OK - see attachments 1 & 2 FEE64 temperatures OK - see attachment 3 good event statistics OK - see attachment 4 nnaida2 rate due to one hot channel Merger OK - see attachment 5 TapeServer OK - see attachment 6 no errors or warnings shown by server terminal sessions 1.8.L spectra - see attachments 7 & 8 1.8.W spectra 20us FSR - see attachments 9 & 10 09.24 temperature +25.5 deg C, RH 43.4%, d.p. +11.9 deg C Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level c. 75% 16.25 Julabo FL11006 refill to just below H indicator DAQ continues OK - current file Sep18/R2_19
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown