AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:36:52 2025
Author
*
:
Subject
*
:
09.54 DAQ continues OK - current file Sep18/R2_26 09.55 all system wide checks OK *except* nnaida7 fails ADC calibration detector biases & leakage currents OK - see attachments 1 & 2 FEE64 temperatures OK - see attachment 3 good event statistics OK - see attachment 4 nnaida2 rate due to one hot channel Merger OK - see attachment 5 TapeServer OK - see attachment 6 no errors or warnings shown by server terminal sessions 1.8.L spectra - see attachments 7 & 8 1.8.W spectra 20us FSR - see attachments 9 & 10 10.00 temperature +25.7 deg C, RH 29.6%, d.p. +6.4 deg C Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level c. 80% 10.03 ASIC check load (file Sep18/R2_26)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown