AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:28:53 2025
Author
*
:
Subject
*
:
> October 25th: > In anticipation of losing access in the evening on arrival at RIKEN the following was done: > - Chiller was refilled > - All power cables reconnected after being removed in October for the RIKEN power down > - All NIM bins, fan trays and RPis were turned on > - 50MHz AIDA clock was set up and connected > - Remote connections to AC Mains relay and RPi for CAEN bias was tested > - Chiller was powered up > > October 26th: > > 11:31 Still have access to the F11 area due to a bigRIPS delay. > Double checked wiring from yesterday and all still seems good > Chiller is still running with set point at +20 deg C > > 11:36 FEEs powered up. All 24 mounted > > 11:57 Bias and leakage currents all ok - attachment 1 > FEE temperatures all ok - attachment 2 > System wide checks all ok > > 13:26 Bias and leakage currents ok - attachment 3 > FEE temperatures all ok - attachment 4 > System wide checks all ok > > 14:00 Stats are ok - attachment 5 > Appear similar to last time: https://elog.ph.ed.ac.uk/AIDA/747 > However FEE24 and 24 appear much noisier than last time with rates around 100k > > 19:24 Pulser walkthrough run from 90000 to 10000 in steps of 10000 for R2 > Opened file Oct18/R3, alpha run, threshold at 100kev, pulser on. >
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown