AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:37:18 2025
Author
*
:
Subject
*
:
08.34 DAQ continues OK - current file Oct18/R9_6 08.37 all system wide checks OK *except* nnaida7 fails ADC calibration detector biases & leakage currents OK - see attachments 1 & 2 FEE64 temperatures OK - see attachment 3 good event statistics OK - see attachment 4 nnaida2 rate due to one hot channel Merger OK - see attachment 5 TapeServer OK - see attachment 6 no errors or warnings shown by server terminal sessions 1.8.L spectra - see attachments 7 & 8 1.8.W spectra 20us FSR - see attachments 9 & 10 08.50 temperature +23.8 deg C, RH 38.0%, d.p. +8.6 deg C Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level c. 75% 11.10 DAQ continues OK - current file Oct18/R9_7 15.18 system wide checks OK, except nnaida7 ADC calibration failure leakage currents OK (attachment 11) FEE64 temperatures okay (attachment 12) 15.23 good event statistics OK (attachment 13) Merger and TapeServer OK (attachments 14 and 15) DAQ still running OK - Oct18/R9_8 15.54 Chiller refilled
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown