AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:28:32 2025
Author
*
:
Subject
*
:
> 08.34 DAQ continues OK - current file Oct18/R9_6 > > 08.37 all system wide checks OK *except* nnaida7 fails ADC calibration > > detector biases & leakage currents OK - see attachments 1 & 2 > > FEE64 temperatures OK - see attachment 3 > good event statistics OK - see attachment 4 > nnaida2 rate due to one hot channel > > Merger OK - see attachment 5 > TapeServer OK - see attachment 6 > no errors or warnings shown by server terminal sessions > > 1.8.L spectra - see attachments 7 & 8 > 1.8.W spectra 20us FSR - see attachments 9 & 10 > > 08.50 temperature +23.8 deg C, RH 38.0%, d.p. +8.6 deg C > Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level c. 75% > > 11.10 DAQ continues OK - current file Oct18/R9_7 > > 15.18 system wide checks OK, except nnaida7 ADC calibration failure > leakage currents OK (attachment 11) > FEE64 temperatures okay (attachment 12) > > 15.23 good event statistics OK (attachment 13) > Merger and TapeServer OK (attachments 14 and 15) > DAQ still running OK - Oct18/R9_8 > > 15.54 Chiller refilled
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown