AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:35:41 2025
Author
*
:
Subject
*
:
09.24 DAQ continues OK - current file Oct18/R12_116 alpha background run 09.20 all system wide checks OK *except* nnaida7 fails ADC calibration detector biases & leakage currents OK - see attachments 1 & 2 FEE64 temperatures OK - see attachment 3 good event statistics OK *except* nnaida17 c. 400k - see attachment 4 nnaida2 rate due to one hot channel as before Merger - Link16 errors reported - see attachment 5 TapeServer OK - see attachment 6 problem with nnaida17 rate resolved with ASIC check load - see attachment 7 1.8.L spectra - see attachments 7 & 8 N.B. evidence of minimally ionising particles (presumably protons) from beam to F11 E detector ~10-15cm Pb bricks were placed within BRIKEN (CH2)n stack to stop heavy particles 1.8.W spectra 20us FSR - see attachments 9 & 10 09.33 DAQ stop - file Oct18/R12_117 All Oct18/R12_* files deleted 09.34 all spectra zero'd DAQ start - file Oct18/R13 alpha background run all FEE64 good events statistics OK - see attachment 11 15.11 DAQ continues ok, on file Oct18/R13_2 (alpha run) system wide checks ok, except nnaida7 failing ADC calibration FEE64 temperatures ok (attachment 13) detector bias and leakage currents ok (attachment 14) good event statistics ok, except nnaida2 due to one hot channel (attachment 15) Merger and TapeServer ok, no errors in terminal 15.20 DAQ stop - file Oct18/R13_2 15.24 Lowered slow comparator threshold from 100 to 10 good event statistics ok (attachment 16) 15.42 took waveforms, triggering ok (attachment 17) raised slow comparator threshold to 100 from 10 start DAQ (R14) nnaida22, no statistics showing (see attachment 18) subsequent failure to connect to nnaida2 16:44 fixed by rebooting nnaida2 *only*, nnaida2 reset, setup all FEE64s slow comparator threshold re-raised from 10 to 100, as default was restored DAQ and alpha run restarted (R15) Merger and TapeServer ok, no errors in terminal good event statistics all ok, except for nnaida2 hot channel (attachment 19)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown