AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:35:46 2025
Author
*
:
Subject
*
:
10.02 DAQ still running, on file Oct18/R27_9 Merger and TapeServer ok, no error warnings in terminals 10.07 Good event statistics ok, except nnaida6 rate being high (attachment 1) nnaida17 rate ok, but counts very high. May have run fast at some point overnight. System wide checks ok, except nnaida7 failure in ADC calibration FEE64 temperatures ok (attachment 2) 10.13 Bias/leakage currents slightly higher, but ok (attachment 3) 10:30 1.8.W spectra (attachment 4) 11.10 Stopped the DAQ (R27_9) Checked ASIC control - ok Started the DAQ again (Oct18/R28_0) good event statistics ok, aside from nnaida6 running slightly fast (attachment 5) 15.07 DAQ stop - file Oct18/R28_2 Detector bias OFF Move AIDA downstream to check position of Clover G7 16.05 Move back upstream into BRIKEN (CH2)n moderator assembly Detector bias ON 16.12 all system wide checks OK *except* nnaida7 fails ADC calibration sync all ASIC clocks using ReSYNC detector biases & leakage currents OK - see attachments 6 & 7 FEE64 temperatures OK - see attachment 8 good event statistics OK *except* nnaida2 - see attachment 9 see attachment 10 for comparison to statistics 5.1.18 16.41 1.8.W spectra 20us FSR - see attachments 11 & 12 16.55 slow comparator thresholds raised from 10 to 100 DAQ start (Oct18/R29_0) Merger and TapeServer ok - no error warnings in terminals good event statistics ok, except nnaida6 running fast (attachment 13)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown