AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:14:38 2025
Author
*
:
Subject
*
:
> 10.02 DAQ still running, on file Oct18/R27_9 > Merger and TapeServer ok, no error warnings in terminals > > 10.07 Good event statistics ok, except nnaida6 rate being high (attachment 1) > nnaida17 rate ok, but counts very high. May have run fast at some point overnight. > System wide checks ok, except nnaida7 failure in ADC calibration > FEE64 temperatures ok (attachment 2) > > 10.13 Bias/leakage currents slightly higher, but ok (attachment 3) > > 10:30 1.8.W spectra (attachment 4) > > 11.10 Stopped the DAQ (R27_9) > Checked ASIC control - ok > Started the DAQ again (Oct18/R28_0) > good event statistics ok, aside from nnaida6 running slightly fast (attachment 5) > > 15.07 DAQ stop - file Oct18/R28_2 > > Detector bias OFF > > Move AIDA downstream to check position of Clover G7 > > 16.05 Move back upstream into BRIKEN (CH2)n moderator assembly > > Detector bias ON > > 16.12 all system wide checks OK *except* nnaida7 fails ADC calibration > sync all ASIC clocks using ReSYNC > detector biases & leakage currents OK - see attachments 6 & 7 > FEE64 temperatures OK - see attachment 8 > good event statistics OK *except* nnaida2 - see attachment 9 > see attachment 10 for comparison to statistics 5.1.18 > > 16.41 1.8.W spectra 20us FSR - see attachments 11 & 12 > > 16.55 slow comparator thresholds raised from 10 to 100 > DAQ start (Oct18/R29_0) > Merger and TapeServer ok - no error warnings in terminals > good event statistics ok, except nnaida6 running fast (attachment 13) > > > > >
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown