AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:35:29 2025
Author
*
:
Subject
*
:
16.36 DAQ continues ok AIDA file RIBF148/R5_198 BRIKEN file 37 BigRIPS file 1022 16.38 system wide checks ok, except nnaida7 ADC calibration failure 16.40 FEE64 temperatures ok (attachment 1) 16.42 good event statistics ok (attachment 2) 16.43 detector bias/leakage currents ok (attachment 3) 16.44 Merger and TapeServer ok, no error messages in terminals (attachments 4 and 5) 16.51 BRIKEN stop AIDA file RIBF148/R5_200 17.00 Al Degrader thickness changed from 2.3mm to 2.8mm The 2.3mm plate was previously assumed to be 2.5mm, but this has been corrected by measuring individual Al plates with digital micrometer. 17.02 BRIKEN start BRIKEN file 38 BigRIPS file 1023 AIDA file RIBF148/R5_202 18.01 BRIKEN stop AIDA file RIBF148/R5_211 18.03 BRIKEN start AIDA file RIBF148/R5_212 BRIKEN file 39 BigRIPS file 1024 18.08 system wide checks ok, except nnaida7 ADC calibration failure FEE64 temperatures ok (attachment 6) good event statistics ok (attachment 8) detector bias/leakage currents ok (attachment 7) 18.11 Merger and TapeServer ok, no error messages in terminal 19.00 BRIKEN stop AIDA file RIBF148/R5_221 19.02 BRIKEN start AIDA file RIBF148/R5_221 BRIKEN file 40 BigRIPS file 1025 19.57 system wide checks ok, except nnaida7 ADC calibration failure FEE64 temperatures ok (attachment 9) good event statistics ok (attachment 10) detector bias/leakage current ok (attachment 11) 20.01 BRIKEN stop AIDA file RIBF148/R5_231 20.03 BRIKEN start AIDA file RIBF148/R5_231 BRIKEN file 41 BigRIPS file 1026 21.01 BRIKEN stop AIDA file RIBF148/R5_240 21.03 BRIKEN start AIDA file RIBF148/R5_240 BRIKEN file 42 BigRIPS file 1027 21:18 system wide checks ok - except nnaida7 ADC calibration failure FEE64 temperatures ok (attachment 12) good event statistics ok (attachment 13) detector bias/leakage current ok (attachment 14) 22:01 BRIKEN stop AIDA file RIBF148/R5_250 22:03 BRIKEN start AIDA file RIBF148/R5_250 BRIKEN file 43 BigRIPS file 1028 22:10 system wide checks ok - except nnaida7 ADC calibration failure FEE64 temperatures ok (attachment 15) good event statistics ok (attachment 16) detector bias/leakage current ok (attachment 17) Merger and TapeServer ok, no error messages in terminal 23:01 BRIKEN stop AIDA file RIBF148/R5_260 23:03 BRIKEN start AIDA file RIBF148/R5_260 BRIKEN file 44 BigRIPS file 1029 23.05 system wide checks ok - except nnaida7 ADC calibration failure FEE64 temperatures ok (attachment 18) good event statistics ok (attachment 20) detector bias/leakage current ok (attachment 19) Merger and TapeServer ok, no error messages in terminal
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown