AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:17:37 2025
Author
*
:
Subject
*
:
> 16.36 DAQ continues ok > AIDA file RIBF148/R5_198 > BRIKEN file 37 > BigRIPS file 1022 > > 16.38 system wide checks ok, except nnaida7 ADC calibration failure > > 16.40 FEE64 temperatures ok (attachment 1) > > 16.42 good event statistics ok (attachment 2) > > 16.43 detector bias/leakage currents ok (attachment 3) > > 16.44 Merger and TapeServer ok, no error messages in terminals (attachments 4 and 5) > > 16.51 BRIKEN stop > AIDA file RIBF148/R5_200 > > 17.00 Al Degrader thickness changed from 2.3mm to 2.8mm > The 2.3mm plate was previously assumed to be 2.5mm, but this has been corrected by measuring individual Al > plates with digital micrometer. > > 17.02 BRIKEN start > BRIKEN file 38 > BigRIPS file 1023 > AIDA file RIBF148/R5_202 > > 18.01 BRIKEN stop > AIDA file RIBF148/R5_211 > > 18.03 BRIKEN start > AIDA file RIBF148/R5_212 > BRIKEN file 39 > BigRIPS file 1024 > > 18.08 system wide checks ok, except nnaida7 ADC calibration failure > FEE64 temperatures ok (attachment 6) > good event statistics ok (attachment 8) > detector bias/leakage currents ok (attachment 7) > > 18.11 Merger and TapeServer ok, no error messages in terminal > > 19.00 BRIKEN stop > AIDA file RIBF148/R5_221 > > 19.02 BRIKEN start > AIDA file RIBF148/R5_221 > BRIKEN file 40 > BigRIPS file 1025 > > 19.57 system wide checks ok, except nnaida7 ADC calibration failure > FEE64 temperatures ok (attachment 9) > good event statistics ok (attachment 10) > detector bias/leakage current ok (attachment 11) > > 20.01 BRIKEN stop > AIDA file RIBF148/R5_231 > > 20.03 BRIKEN start > AIDA file RIBF148/R5_231 > BRIKEN file 41 > BigRIPS file 1026 > > 21.01 BRIKEN stop > AIDA file RIBF148/R5_240 > > 21.03 BRIKEN start > AIDA file RIBF148/R5_240 > BRIKEN file 42 > BigRIPS file 1027 > > 21:18 system wide checks ok - except nnaida7 ADC calibration failure > FEE64 temperatures ok (attachment 12) > good event statistics ok (attachment 13) > detector bias/leakage current ok (attachment 14) > > 22:01 BRIKEN stop > AIDA file RIBF148/R5_250 > > 22:03 BRIKEN start > AIDA file RIBF148/R5_250 > BRIKEN file 43 > BigRIPS file 1028 > > 22:10 system wide checks ok - except nnaida7 ADC calibration failure > FEE64 temperatures ok (attachment 15) > good event statistics ok (attachment 16) > detector bias/leakage current ok (attachment 17) > Merger and TapeServer ok, no error messages in terminal > > 23:01 BRIKEN stop > AIDA file RIBF148/R5_260 > > 23:03 BRIKEN start > AIDA file RIBF148/R5_260 > BRIKEN file 44 > BigRIPS file 1029 > > 23.05 system wide checks ok - except nnaida7 ADC calibration failure > FEE64 temperatures ok (attachment 18) > good event statistics ok (attachment 20) > detector bias/leakage current ok (attachment 19) > Merger and TapeServer ok, no error messages in terminal > > > > > > > > >
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown