Message ID: 788
Entry time: Thu Nov 15 22:55:38 2018
|
Author: |
CA, TD, OH, LS |
Subject: |
Friday 16th November 08.00 - 16.00 |
|
|
07.56 DAQ continues - AIDA file RIBF148/R5_822
165Pm BigRIPS setting + 2.8mm Al degrader
08.13 zeroed xy hit pattern on online analysis and MIDASsort
08.30 system wide checks ok, except nnaida7 ADC calibration failure
FEE64 temperatures ok (attachment 1)
good event statistics ok (attachment 2)
detector bias/leakage currents ok (attachment 3)
08.34 Merger and TapeServer ok, no error messages in terminal (attachments 4/5)
08.40 zeroed all spectra on online analysis and MIDASsort
08.44 BRIKEN and BigRIPS stop
AIDA file RIBF148/R5_830
08.45 BigRIPS starts run 1087
BRIKEN starts run 102
AIDA on file RIBF148/R5_830
09.13 n vs p multiplicity (attachment 6)
xy hit pattern (*deleted, took wrong screenshot, sorry! -CA@12.16*)
Energy X vs Energy Y plot (*deleted, took wrong screenshot, sorry! -CA@12.16*)
12.17 see elog entry for 15th November 2018 00.00-08.00 (attachments 9 and 10) for screenshots of the above before
degrader change
09.17 BRIKEN and BigRIPS stop
AIDA on file RIBF148/R5_836
beam stop to change Al degrader thickness to 3.3mm
09.23 chiller refilled while access available
humidity, temperature, dew point measurements obtained
09.25 detector bias/ leakage currents ok (attachment 7)
09.30 zeroed all spectra in online analysis and MIDASsort
09.31 beam back on
BRIKEN and BigRIPS start
AIDA file RIBF148/R5_838
BRIKEN run 103
BigRIPS run 1088
10.32 BRIKEN and BigRIPS stop
AIDA file RIBF148/R5_848
10.33 BRIKEN and BigRIPS start
AIDA file RIBF148/R5_848
BRIKEN run 104
BigRIPS run 1089
10.45 system wide checks ok, except nnaida7 ADC calibration failure
FEE64 temperatures ok (attachment 8)
good event statistics ok (attachment 10)
detector bias/leakage currents ok (attachment 9)
11.20 ran analyser on file R5_847 - attachment 11
no timewarps observed
dead time in nnaida19 at ~1s out of 355.283s (~0.3%)
rest at zero, except nnaida20 at ~0.6s and nnaida21 at ~0.1s
11.33 BRIKEN and BigRIPS stop
AIDA file RIBF148/R5_859
11.34 BRIKEN and BigRIPS start
AIDA file RIBF148/R5_859
BRIKEN run 105
BigRIPS run 1090
12.05 n vs p multiplicity (attachment 12)
xy hit pattern (attachment 13)
Energy X vs Energy Y plot (attachment 14)
this is after change of Al degrader thickness to 3.3mm
12.36 BRIKEN and BigRIPS stop
AIDA file RIBF148/R5_869
12.36 BRIKEN and BigRIPS start
AIDA file RIBF148/R5_869
BRIKEN run 106
BigRIPS run 1091
12.40 online histograms
per FEE64 Rate - attachment 15
per FEE64 HitRate - attachment 16
1.8.L spectra - attachments 17-20
nnaida1 pulser peak width 70ch FWHM
1.8.H spectra - attachments 21-22
1.8.W spectra - attachments 23-24
12.47 beam off
AIDA file RIBF148/R5_870
12.54 BRIKEN and BigRIPS stop
AIDA file RIBF148/R5_871
13.10 MIDASsort analysis RIBF148/R5_871 - all ADC data synchronised - attachments 25-26
13.16 correlation analysis decay plots for each detector with the Al degrader thickness at 3.3mm (attachment 23)
see elog entry November 15th 2018 00:00-08:00 (attachments 16-18) for same plots with previous degrader
thickness.
13.26 system wide checks ok, except nnaida7 ADC calibration failure
FEE64 temperatures ok (attachment 24)
good event statistics ok (attachment 25)
detector bias/leakage currents ok (attachment 26)
15.04 see other elog entries for correlation analysis and high energy Ex vs Ey plots compared between different Al
degrader thicknesses.
15.38 system wide checks ok, except nnaida7 ADC calibration failure
FEE64 temperatures ok (attachment 28)
good event statistics ok (attachment 27)
detector bias/leakage currents ok (attachment 29)
15.55 BRIKEN start background measurement
BRIKEN not writing to file
AIDA file RIBF148/R5_896
Online histograms available
16.00 BRIKEN start writing to file
AIDA file RIBF/R5_897
BRIKEN run 107
17.18 DAQ stop AIDA file RIBF148/R5_907
End of run RIBF148 due to accelerator problems requiring ~3-4 days to fix
'low' mass BigRIPS setting postponed
ASIC check load
all onine histograms zero'd
17.22 DAQ start AIDA file RIBF148/R6
Pulser walkthrough
BNC PB-4 amplitudes 90,000 - 10,000 @ 10,000 step
x5 attenuator IN
Frequency 25Hz range
Delay MIN
Polarity -
Tail pulse
17.37 DAQ trop AIDA file RIBF148/R6_2
1.8.L spectra - see attachments 30 & 31
17.40 DAQ start AIDA file RIBF148/R7
Pulser walkthrough
BNC PB-4 amplitudes 1,200 - 1,000 @ 1,000 step
x5 attenuator IN
Frequency 25Hz range
Delay MIN
Polarity -
Tail pulse
17.50 DAQ stop AIDA file RIBF148/R7_1
1.8.L spectra - see attachments 32 & 33
17.54 DAQ start AIDA file RIBF148/R8
background
BNC PB-4 pulser OFF
18.00 detector biases & leakage currents OK - see attachments 34 & 35
FEE64 temperatures OK - see attachment 36
good event statistics OK - see attachments 37
Merger OK - see attachment 38
TapeServer OK - see attachment 39
no error or warning messages terminal server sesssions reported
per FEE64 Rate spectra - attachment 40
1.8.W spectra 20ms FSR - attachments 41 & 42
18.10 DAQ stop AIDA file RIBF148/R8_2
Detector bias OFF
FEE64 power OFF
18.12 Ambient temperature +25.5 deg C, d.p. +2.2 deg C, RH 21.5%
18.15 Withdraw AIDA from BRIKEN - done
2x NIM bin OFF
1x NIM bin fan tray OFF
1x USB ac mains relay OFF
Julabo FL11006 chiller OFF front panel/rear panel/wall-mounted 3ph outlet
2x network cables disconnected and coiled/cable-tied to stairwell railings
disconnect coorelation scaler trigger & reset inputs to root MACB front panel
disconnect 50MHz TTL clock root MACB rear panel
disconnect AIDA plastic veto
discopnnect 2x ac mains cabnles from ac mains distribution box
remove AIDA support assembly nose support
19.00 raise AIDA support assembly feet/lower AIDA support assembly wheels from/to F11 floor
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|