AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:31:05 2025
Author
*
:
Subject
*
:
Overnight Beam tuning, PID tests - beam stopped in scintilator detector + 1" thick Pb bricks DAQ ran OK (not to disk) DSSSD #3 tripped, re-enabled OK 09.00 AIDA temperatures - attachment 1 CAEN N1419 HV settings - attachment 2 09.25 Statistics & lost activity - attachments 3-8 10.30 Scintilator detector + 1" thick Pb bricks removed ~1KHz 84Zn to Degrader + MICA + Veto + AIDA DSSSDs #1-3 + 10mm Al Data file R15 12.15-12.59 beam lost Attachments 9-14 DSSSD #1-3 HEC ADC spectra, HEC LLD 0x08 Attachments 15-16 Examples of Data Readout Control following stalled DAQ GO (no SYNCs) Data file R16 13.02-13.46 SYNCs lost/MERGE stalled HEC LLD 0x02 Data file R17 13.46-14.20 Data file R19 15.30-17.05 Data file R20 17.06 Fast comparator LLD HEC 0x02, LEC 0x20 (except nnaida30 HEC 0x20) 22.14 Data file R22 22.14 - 30.4.15 09.00 Now using /data20/TapeData/May2015 to store data Spectra cleared at start of run DAQ OK, CAEN N1419 ch #2 tripped
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown