AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:29:15 2025
Author
*
:
Subject
*
:
> 10.18 DAQ continues OK to file May19/R5_1 > > alpha background > > ASIC settings 2018Oct03-13.26.58 > *except* slow comparator 0xa -> 0x64 > > BNC PB-4 Pulser OFF > > all system wide checks OK *except* nnaida7 fails ADC calibration > > detector biases & leakage currents OK - see attachments 1 & 2 > > FEE64 temperatures OK - see attachment 3 > good event statistics OK - see attachments 4 > > Merger OK - see attachment 5 > TapeServer OK - see attachment 6 > > 1.8.W spectra 20us FSR - attachments 7 & 8 > 1.8.W spectra 20ms FSR - attachments 9 & 10 > > Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C - water topped up > Temperature +24.8 deg C dew point +8.3 deg C RH 35.3% > > 10.42 DAQ stop May19/R5_2 > > slow comparator 0x64 -> 0xa > Check ASIC Control *all* ASICs & FEE64s > > 10:52 AIDA inserted ~4cm into DTAS > 60Co (~40kBq) + 137Cs (~8kBq) sources located approximately 4cm in front of the front face of the snout > > 10.54 DAQ start May19/R6 > > good event statistics OK - see attachments 11 > *all* FEE64s <100k, 9x < 20k > data rate 4.9Mb/s 0.64M data items/s > > 11.04 nnaida17 good events c. 350k returns to 13k following Check ASIC Control (nnaida1 OK - see > https://elog.ph.ed.ac.uk/AIDA/801 ) > AIDA disc statistics indicate that fast discriminators were source of higher rate - next time this > happens we should check HitRate to see whether this is a specific channel or channels and possibly > mask > > 11.17 DTAS DAQ issues correlation scaler reset > AIDA data file May19/R6_3 > > use files *from* R6_4 > > 11.39 DAQ stop file May19/R6_8 > > nnrpi1 is offline - we suspect wrench or power tool placed too close to RPi when we moved AIDA > into DTAS and we jostled one or other of the cables connected to nnrpi1 > > nnrpi1 power cycled to reboot > *all* FEE64s OK > USB ac mains relay controls recovered OK > CAEN N1419 contrs recovered OK > > 11.48 AIDA withdrawn from DTAS for installation of upstream (CH2)n shield and additional Pb wall > > 11.52 DAQ starts to file May19/R7 > > alpha background resumes > > ASIC settings 2018Oct03-13.26.58 > *except* slow comparator 0xa -> 0x64 > > BNC PB-4 Pulser OFF > > 18.06 DAQ continues ok, on file May19/R7_0 > > all system wide checks OK *except* nnaida7 fails ADC calibration > > detector biases & leakage currents OK - see attachment 13 > > FEE64 temperatures OK - see attachment 14 > good event statistics OK - see attachment 15 > > Merger and TapeServer ok > > Temperature +25.0 deg C dew point +4.4 deg C RH 27.0% > > > >
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown