AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:35:28 2025
Author
*
:
Subject
*
:
10:18 DAQ Continues ok Alpha run continues - Currently on file R8_2 System wide checks all ok Detector bias/leakage currents ok - attachment 1 Temp +25.6 deg C, Humidity 34.5% AND D.P +8.8 deg C FEE Temperatures ok - attachment 2 Good event statistics ok - attachment 3 Merger & TapeServer ok - attachments 4 & 5 17.15 DAQ continues OK to file May19/R8_2 alpha background ASIC settings 2019May19-17.54.03 slow comparator 0x64 BNC PB-4 Pulser OFF all system wide checks OK *except* nnaida7 fails ADC calibration detector biases & leakage currents OK - see attachments 6 & 7 FEE64 temperatures OK - see attachment 8 good event statistics OK - see attachments 9 Merger OK - see attachment 10 TapeServer OK - see attachment 11 1.8.L spectra - see attachments 12 & 13 p+n FEE64s 1.8.W spectra 20us FSR - attachment 14 n+n FEE64s 1.8.W spectra 20us FSR - attachment 15 17.25 analysis of May19/R8_2 - see attachment 16 deadtime OK ADC data for FEE64s nnaida5 & nnaida6 hot channels (Stat spectrum channel # 104) Also observed at a much lower rate for nnaida1 & nnaida2 17.27 Check ASIC Control *all* ASICs & FEE64s 13.27 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C Water level c. 60% M-H markers - water topped up (1x jugful) to H level marker Temperature +25.4 deg C dew point +9.6 deg C RH 36.3%
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown