AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:18:18 2025
Author
*
:
Subject
*
:
> It's a new day, it's a new log entry !! > > 01:25 DTAS run 46 started > BigRIPS run 2019 > AIDA run R2_268 > > DAQ running smoothly > No change in Stat and Rate (stat zeroed at the beginning of this DTAS run)- See attachment 1 > Merger rate: 630k item/sec - See Attachment 2 > TapeServer rate still ~5 Mbytes/sec - See attachment 3 > > Temperature and HV ok - See attachment 5 & 6 > > System-wide checks OK except nnaida7 fails ADC calibration as usual. > > !!! > Victor said that the run AIDA R2_249 is missing in the correlation merge data. This is the run when the > correlation scaler was reset (as DTAS was running out of range in some of their timing histograms) (See > elog end of Sunday) > !!! > > 02:23 Rate in DSSD#3 card 9 and 12 slowly reaching 100kHz while 14 and 15 ~ 50kHz. See attachment 7 > TapeServer rate ~ 5.5 kHz > > > 03:25 Change of DTAS run: > DTAS run 49 started > BigRIPS run 2020 > AIDA run R2_286 > > Experiment still running smoothly. No significant change since last comments 2h ago. > Leakage current in detector 3 is increasing slowly see attachment 8 & 9 > > 05:25 Change of DTAS run: > Note: DTAS run stopped during AIDA R2_305 and re-started during R2_306. > > DTAS run 52 started > BigRIPS run 2021 > AIDA run R2_306 > > Pretty quiet night shift. > Stat & Rate in attachment 10 - DSSD#3 FEE card 9 back down to 60kHz > Merger rate: 650k item/sec - See attachment 11 > TapeServer rate still ~5.1 Mbytes/sec - See attachment 12 > > System-wide checks OK except nnaida7 fails ADC calibration as usual. > > X vs Y HEC spectrum in attachment 13 > LEC E vs HEC-LEC spectrum in attachment 14 > Both spectra zeroed > > Bias in attachment 15 > Temperature unchanged > > 07:30 DTAS and BigRIPS stop runs > AIDA on file R2_323 > > 07:33 New Run numbers > DTAS Run: 55 > BigRIPS Run: 2022 > AIDA on File: R2_324 > > 07:56 System wide checks ok > Fee temps ok - attachment 16 > > 100Sn setting, no degrader > > ASIC settings 2019Jun13-08.56.35 > > BNC PB-4 Pulser > Amplitude 90,000 > x5 attenuator IN > Frequency 25Hz range, variable min. c. 2.5Hz > t_r 100ns, tau_d 50us > - polarity > Delay MIN, tail pulse > > 08:28 Bias and leakage ok - attachment 17 > > 08:48 ASIC check successful > > 09:32 DTAS and BigRIPS stop > AIDA on file R2_342 > > DTAS starts file 58 > BigRIPS run 2023 > AIDA still on file R2_342
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown