AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:37:03 2025
Author
*
:
Subject
*
:
10.41 DAQ continues OK file RIBF147/R2_352 100Sn setting, no degrader ASIC settings 2019Jun13-08.56.35 DSSSD#1 slow comparator 0xa -> 0x1d DSSSD#3 slow comparator 0xa -> 0x8 BNC PB-4 Pulser Amplitude 90,000 x5 attenuator IN Frequency 25Hz range, variable min. c. 2.5Hz t_r 100ns, tau_d 50us - polarity Delay MIN, tail pulse all system wide checks OK *except* nnaida7 fails ADC calibration detector biases & leakage currents OK - see attachments 1 & 2 FEE64 temperatures OK - see attachment 3 good event statistics - OK - see attachment 4 11x <20k 21x < 50k 24x <100k Merger OK - see attachment 5 TapeServer OK - see attachment 6 p+n FEE64s 1.8.W spectra 20us FSR - attachment 7 n+n FEE64s 1.8.W spectra 20us FSR - attachment 8 1.8.L spectra - see attachments 9 & 10 nnaida1 73 ch FWHM, nnaida3 78 ch FWHM FEE64 Rate spectra - attachment 11 Note high rate issues observed for *some* strips in nnaida14 ASIC #3 & #4 fixed (temporarily) by Check ASIC Control FEE64 Rate spectra - attachment 12 10.58 ADC data synchronised - attachment 13 Online MIDASsort spectra - attachments 14-18 11.04 analysis of file RIBF147/R2_353 - attachment 19 deadtime <<1% *all* FEE64s no timewarps 11.12 HitRate spectra - attachment 20 disable nnaida14 *hot* channels 29, 30 & 35 11.15 zero all histograms zero DAQ stats 12.31 DTAS and BigRIPS stop AIDA on file R2_368 DTAS starts file 63 BigRIPS run 2025 AIDA file R2_368 13:08 R2_374 The putty window for USB2 had frozen with a 1 in the voltage set as shown in attachment 1 The window was no longer updating. When regaining the window the voltage limit was applied and the detector began to ramp down The set voltage was reset to 100V and bias was regained. Total time with less than 100V was around 30sec 14:28 DTAS and BigRIPS stop AIDA on run R2_386 DTAS Starts file 66 BigRIPS run 2026 AIDA on file R2_387 14:32 Bias and leakage currents ok - attachment 21 15:07 Rate spectra showing no spikes in DSSD 3 System wide checks 15:08 DTAS and BigRIPS stop AIDA onfile R2_393 BigRIPS chaning slit positions 14:14 DTAS starts file: AIDA on file R2_394 BigRIPS file 2027 (In control by bigRIPS) 15.30 TAS and BigRIPS stop AIDA onfile R2_396
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown