AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 850     Entry time: Mon Jun 17 08:03:37 2019
Author: CA, CB, TD, OH 
Subject: Mon Jun 17 16:00-24:00 
16:04  DAQ continues running OK
       All system-wide checks OK except nnaida7 ADC calibration fails
       FEE64 temperatures OK - attach 1
       Merger and Tape Server OK - see attach 2 & 3

16:30 DTAS and BigRIPS stop
      AIDA on file R2_406

16:35 Beam stop.
      AIDA plastic gain increased by a factor 2
      Moved the lead bricks between AIDA and F11, 1 cm further away to the sides

      Chiller water level OK
      Humidity  34.6%
      Temperature 23.4 C
      Dew point 7.1 C
      

16:40 Beam restart
      AIDA run R2_408
      DTAS 70 (from DTAS ELOG)
      BigRIPS 2030  (from DTAS ELOG)

      No obvious changes to the implantation pattern. May need more stats.   

      Detector leakage current OK - see attach 4    

17.31 nnaida14 3.*.H & 4.*.H spectra - attachments 5 & 6

      Corresponds to RHS DSSSD#3 - decrease in rate observed but no evidence of systematic variation of HEC energy 

      Modified implantdecay4.f to select events with x & y energy > ADC ch 1600 (c. 1MeV) to observe x-y hit pattern
      of light particles - see attachments 7 & 8
      Low stats but light particle distribution appears to be symmetric with no obvious RHS cut


17:37 DTAS & BigRIPS DAQ stop
      Beam stop
      Lead moved back as before
      AIDA plastic gain decreased by a factor 5

17:40 DTAS and BigRIPS stop
      AIDA on file R2_416


17.48 zero *all* SortSas spectra

17:50 Beam restarting
      AIDA R2_418
      DTAS  73  (72 is a mistake - ignore)
      BigRIPS  2031


18:43 DAQ continues OK
      All system wide checks OK - except nnaida7 fails ADC calibration as usual
      FEE64 temperature OK - see attach 9
      Stats OK - see attach 10
      Merger & Tape Server OK - see attach 11 & 12
      Leakage currents OK - see attach 13
      HEC & LEC events plots attached - attach 14 & 15 - note LEC in DSSD#3 are > 3 MeV only (light particle-like)

18:50 AIDA R2_427
      DTAS 74
      BigRIPS 2031

19.08 DTAS & BigRIPS DAQ stop - beam lost
      AIDA file R2_429

21:15 Beam is back - briefly
      AIDA R2_446

21:17 Beam lost - operators advise "this will take a long time"

22:16 Beam is back!
      AIDA R2_454
      DTAS 78
      BigRIPS 2034

      Statistics OK - attach 15
      FEE64 temperatures OK - attach 16
      Merger & Tape Server OK - see attach 17 & 18
      System-wide checks as usual

      DTAS reports rate in F11 down by 20%, and rate in AIDA plastic sees similar drop.
Attachment 1: 190617_1607_tape.png  94 kB  Uploaded Mon Jun 17 09:08:01 2019  | Hide | Hide all
190617_1607_tape.png
Attachment 2: 190617_1607_temp.png  135 kB  Uploaded Mon Jun 17 09:08:01 2019  | Hide | Hide all
190617_1607_temp.png
Attachment 3: 190617_1647_bias.png  22 kB  Uploaded Mon Jun 17 09:47:30 2019  | Hide | Hide all
190617_1647_bias.png
Attachment 4: 1.png  156 kB  Uploaded Mon Jun 17 10:32:07 2019  | Hide | Hide all
1.png
Attachment 5: 2.png  146 kB  Uploaded Mon Jun 17 10:32:19 2019  | Hide | Hide all
2.png
Attachment 6: 3.png  84 kB  Uploaded Mon Jun 17 10:41:47 2019  | Hide | Hide all
3.png
Attachment 7: 4.png  41 kB  Uploaded Mon Jun 17 10:42:09 2019  | Hide | Hide all
4.png
Attachment 8: 190617_1845_stats.png  87 kB  Uploaded Mon Jun 17 11:47:32 2019  | Hide | Hide all
190617_1845_stats.png
Attachment 9: 190617_1845_temps.png  134 kB  Uploaded Mon Jun 17 11:47:32 2019  | Hide | Hide all
190617_1845_temps.png
Attachment 10: 190617_1846_merger.png  97 kB  Uploaded Mon Jun 17 11:47:32 2019  | Hide | Hide all
190617_1846_merger.png
Attachment 11: 190617_1846_tape.png  94 kB  Uploaded Mon Jun 17 11:47:32 2019  | Hide | Hide all
190617_1846_tape.png
Attachment 12: 190617_1847_bias.png  22 kB  Uploaded Mon Jun 17 11:47:32 2019  | Hide | Hide all
190617_1847_bias.png
Attachment 13: 190617_1848_HEC.png  50 kB  Uploaded Mon Jun 17 11:49:05 2019  | Hide | Hide all
190617_1848_HEC.png
Attachment 14: 190617_1848_LEC_3MeV.png  76 kB  Uploaded Mon Jun 17 11:49:05 2019  | Hide | Hide all
190617_1848_LEC_3MeV.png
Attachment 15: 190617_2224_merger.png  97 kB  Uploaded Mon Jun 17 15:30:47 2019  | Hide | Hide all
190617_2224_merger.png
Attachment 16: 190617_2224_stats.png  87 kB  Uploaded Mon Jun 17 15:30:47 2019  | Hide | Hide all
190617_2224_stats.png
Attachment 17: 190617_2224_temps.png  135 kB  Uploaded Mon Jun 17 15:30:47 2019  | Hide | Hide all
190617_2224_temps.png
Attachment 18: 190617_2225_tape.png  94 kB  Uploaded Mon Jun 17 15:30:47 2019  | Hide | Hide all
190617_2225_tape.png
Attachment 19: 190617_2230_bias.png  18 kB  Uploaded Mon Jun 17 15:30:47 2019  | Hide | Hide all
190617_2230_bias.png
ELOG V3.1.4-unknown