|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
AIDA |
 |
|
Message ID: 850
Entry time: Mon Jun 17 08:03:37 2019
|
Author: |
CA, CB, TD, OH |
Subject: |
Mon Jun 17 16:00-24:00 |
|
|
16:04 DAQ continues running OK
All system-wide checks OK except nnaida7 ADC calibration fails
FEE64 temperatures OK - attach 1
Merger and Tape Server OK - see attach 2 & 3
16:30 DTAS and BigRIPS stop
AIDA on file R2_406
16:35 Beam stop.
AIDA plastic gain increased by a factor 2
Moved the lead bricks between AIDA and F11, 1 cm further away to the sides
Chiller water level OK
Humidity 34.6%
Temperature 23.4 C
Dew point 7.1 C
16:40 Beam restart
AIDA run R2_408
DTAS 70 (from DTAS ELOG)
BigRIPS 2030 (from DTAS ELOG)
No obvious changes to the implantation pattern. May need more stats.
Detector leakage current OK - see attach 4
17.31 nnaida14 3.*.H & 4.*.H spectra - attachments 5 & 6
Corresponds to RHS DSSSD#3 - decrease in rate observed but no evidence of systematic variation of HEC energy
Modified implantdecay4.f to select events with x & y energy > ADC ch 1600 (c. 1MeV) to observe x-y hit pattern
of light particles - see attachments 7 & 8
Low stats but light particle distribution appears to be symmetric with no obvious RHS cut
17:37 DTAS & BigRIPS DAQ stop
Beam stop
Lead moved back as before
AIDA plastic gain decreased by a factor 5
17:40 DTAS and BigRIPS stop
AIDA on file R2_416
17.48 zero *all* SortSas spectra
17:50 Beam restarting
AIDA R2_418
DTAS 73 (72 is a mistake - ignore)
BigRIPS 2031
18:43 DAQ continues OK
All system wide checks OK - except nnaida7 fails ADC calibration as usual
FEE64 temperature OK - see attach 9
Stats OK - see attach 10
Merger & Tape Server OK - see attach 11 & 12
Leakage currents OK - see attach 13
HEC & LEC events plots attached - attach 14 & 15 - note LEC in DSSD#3 are > 3 MeV only (light particle-like)
18:50 AIDA R2_427
DTAS 74
BigRIPS 2031
19.08 DTAS & BigRIPS DAQ stop - beam lost
AIDA file R2_429
21:15 Beam is back - briefly
AIDA R2_446
21:17 Beam lost - operators advise "this will take a long time"
22:16 Beam is back!
AIDA R2_454
DTAS 78
BigRIPS 2034
Statistics OK - attach 15
FEE64 temperatures OK - attach 16
Merger & Tape Server OK - see attach 17 & 18
System-wide checks as usual
DTAS reports rate in F11 down by 20%, and rate in AIDA plastic sees similar drop. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|