AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:28:56 2025
Author
*
:
Subject
*
:
> Shift change > > 16:00 > 115 pnA primary, 290 cps implants at F11 > Presently at AIDA R2_616 > DAQ is running smoothly - passes all system checks (except ADC calib of nnaida7) > Stats okay, though nnaida19 and 24 running a bit high (seems consistent w/ previous shift) - attach 1 > (Consistent with lower thresholds, pasted below) > > 100Sn setting, 0.3mm Al degrader > > ASIC settings 2019Jun13-08.56.35 > DSSSD#1 slow comparator 0xa -> 0x1d > DSSSD#2 slow comparator 0xa -> 0x8 > DSSSD#3 slow comparator 0x8 -> 0xa > > Biases fine - attach 2 > Merger okay - attach 3 > TapeServer okay - attach 4 > > 16:13 New DTAS run 105 > AIDA R2_618 > BigRIPS is still 2044 as at 15:03 > > Temperatures okay - attach 5 > > 16:20 Implant spectra look good, mainly into DSSSD2 - attach 6 > > Spectra saved in ~spectra/specs-2019Jun18-16.24.33 > > 16:30 Zero stats, histograms > > 17:03 Old runs ending > AIDA R2_626 > In principle DTAS 106 but it switches quickly to 107 > BigRIPS 2045 > > 17:10 New run DTAS 108, AIDA R2_627 > > 18:09 New implant profile - attach 6 > New stats - attach 7 > Looks okay > > 19:08 AIDA R2_647, DTAS 110 > > 19:14 AIDA R2_648, DTAS 111, BigRIPS 2046 > > 20:08 XY implants - attach 8 > Bias - attach 9 > Merger - attach 10 > TapeServer - attach 11 > Stats - attach 12 > > 21:15 New runs: BigRIPS 2047, DTAS 115, AIDA R2_668 > > 22:37 XY - attached 13; stats - attached 14 > Primary beam at 120 pnA; implants around 250 cps at F11 > > 23:14 DTAS closes the run > > 23:20 New runs: AIDA R2_688, DTAS 118, BigRIPS 2048
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown