AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:25:43 2025
Author
*
:
Subject
*
:
> 16.10 DAQ continues as before. > Merger rate ~700k items/s and ~5.3Kb/s > Individual FEE rates remain roughly constant > Temps and bias ok. > > 17.33 DTAS run 149 stopped > > DTAS run 150 started > BigRIPS run 2057 > AIDA run ~1.3GB in R2_865 > > 19.30 DTAS run 152 stopped > > DTAS run 153 started > BigRIPS run 2058 > AIDA run ~1.8GB in R2_884 > > Temps and bias ok. > Rates in merger, tape server and individual FEEs as before. > > 19.50 In looking at previous data, AIDA is seeing ~30% fewer implants that what is observed at F11Plastic > Beam spot is not central on AIDA and some ions will be lost over sides of DSSD, but does not look > like it would account for a ~30% reduction > AIDA implant profile shown in Attachment 1 - from file > merged_a2_687_708_br190618_2315_100Sn118_121bgrun2049_sw_Tsi.root > > 21.01 Beam stopped. > DTAS run 155 stopped. > AIDA file R2_899. > > DTAS and AIDA will continue with background measurements. > > 21.04 DTAS run 156 started > AIDA run R2_899 > > Chiller is full. > Lead bricks upstream of moderator. > > That's all folks.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown