AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sun Mar 30 09:19:25 2025
Author
*
:
Subject
*
:
> 10.37 Post - beam, AIDA & DTAS run only > DTAS stop run 164 > AIDA file R2_1012 > > 10.54 DTAS start run 165 > AIDA file R2_1015 > DTAS begins calibration with 24Na source > > 11.06 DAQ continues running OK > All system wide checks ok *except* nnaida7 fails ADC calibration > FEE64 temperature OK - see attach 1 > Good events rate OK - see attach 2 > Leakage currents OK - see attach 3 > Merger & Tape server OK - see 4 & 5 > > 11.47 DTAS stop run 166 > AIDA file R2_1022 > > 12.03 DTAS start run 167 > AIDA file R2_1025 > Caesium measurement > > 13.18 DTAS stop run 169 > AIDA file R2_1035 > > 14.59 DTAS opens file run 172 > AIDA file R2_1049 > > > 14.57 DAQ continues OK file RIBF147/R2_352 > > postrun background and gamma source tests > > ASIC settings 2019Jun13-08.56.35 > DSSSD#1 slow comparator 0x1d > DSSSD#2 slow comparator 0x8 > > BNC PB-4 Pulser > Amplitude 90,000 > x5 attenuator IN > Frequency 25Hz range, variable min. c. 2.5Hz > t_r 100ns, tau_d 50us > - polarity > Delay MIN, tail pulse > > all system wide checks OK *except* nnaida7 fails ADC calibration > > detector biases & leakage currents OK - see attachments 6 & 7 > > FEE64 temperatures OK - see attachment 8 > > good event statistics - OK - see attachment 9 > 11x <20k 22x < 50k 23x <100k > Merger - 1x Q 21 error see attachment 10 > TapeServer OK - see attachment 11 > > p+n FEE64s 1.8.W spectra 20us FSR - attachment 12 > n+n FEE64s 1.8.W spectra 20us FSR - attachment 13 > 1.8.L spectra - see attachments 14 & 15 > nnaida1 78 ch FWHM, nnaida3 81 ch FWHM > 1.8.H spectra - see attachments 16 & 17 > > FEE64 Rate spectra - attachment 18 > Check ASIC Control x1 > > 11.04 analysis of file RIBF147/R2_1051 - attachment 19 > deadtime <<1% all FEE64s *except* nnaida19 ~2% > no timewarps > > 16.00 AIDA file R2_1058 > DTAS sends sync pulse > DTAS having issues with DAQ speed > > 16.30 DTAS stop 175 > AIDA file R2_1062 > > 16.32 pulser walkthrough start > > BNC PB-4 Pulser > Amplitude 90,000 > x5 attenuator IN > Frequency 250Hz range, variable min. c. 25Hz > t_r 100ns, tau_d 50us > - polarity > Delay MIN, tail pulse > > 90000 - 10000 in 10000 steps walkthrough file R3 - see attachments 20 & 21 > > 12000 - 2000 in 2000 steps walkthrough file R5 - see attachments 22 & 24 > > ignore file R4 > > 17.08 pulser walkthrough end > > 22.57 DAQ stop > AIDA file TapeData/RIBF147/R6_49 > DTASD stop on run 191
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown