AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:18:20 2025
Author
*
:
Subject
*
:
> stop the daq > > pause merger > > stop TapeServer > > housekeeping checks > > bias off > > individually turn power relays off > > switch off 2x NIN bins, 1x fan tray > > do not turn off clock!! > > turn off aida circuits at power box (careful!) > > turn chiller off - press and hold arrow button > > front panel switch on chiller - off > > wall 3 phase power - off > > withdraw aida clear from DTAS - slowly! > > return power tool, temperature probe and water container to corral > > *if cables* > > network cables - blue, disconnect at switch, reel up at stairwell > > disconnect clock > > aida plastic high voltage and signal > > cables from root macb trigger and reset to DTAS > > mains cables from mains box > > then move aida!
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown