AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 859     Entry time: Fri Jun 21 01:08:35 2019
Author: CA, CB 
Subject: Friday 21 June 
09.08 all system wide checks okay *except* naida7 fails adc calibration
      mismatch between sync pulses received from master and FEE64 - attachment 1

      FEE64 temperatures ok - attachment 2

      detector bias/leakage currents ok - attachment 3
      leakage currents slightly ramping since last night

      RH 50.7%, Temperature 22.2 deg, dew point 11.6 deg

09.30 AIDA powered off and now in safe state
Attachment 1: 21junSync.png  211 kB  Uploaded Fri Jun 21 02:10:48 2019  | Hide | Hide all
21junSync.png
Attachment 2: 20june_2319_temps.png  135 kB  Uploaded Fri Jun 21 02:10:57 2019  | Hide | Hide all
20june_2319_temps.png
Attachment 3: 21jun_bias.png  23 kB  Uploaded Fri Jun 21 02:11:06 2019  | Hide | Hide all
21jun_bias.png
ELOG V3.1.4-unknown