AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sun Mar 30 09:18:09 2025
Author
*
:
Subject
*
:
To make room for the installation of an MR-TOF device at F11, AIDA and DTAS have been removed from their in-beam position at F11. The AIDA network and DTAS/BRIKEN optic fibre cables have been coiled and tied to the E17 stairwell barrier.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown