AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:36:55 2025
Author
*
:
Subject
*
:
Attachments 2 & 7 AIDA FEE64 mezzanine with 1) adaptor PCB connected to ERNI input connector 2) test PCB to provide power & control to FEE64 mezzanine plus probe points for (per ASIC) Data Ready, A0-A3, MUX output, 16x fast comparator, 16x buffered preamp output etc. Attachments 1, 3 & 4 AIDA FEE64 power (middle & right) and fan power (left) N.B. Attachment 1 - mid-upper TTi QL355T FEE64 PSU shows nominal current load ( 5V/1.672A 7V/0.031A ) for configured ASICs Attachment 5 - AIDA FEE64 mezzanines in T9 AIDA cupboard left - 2x boxes with U/S FEE64 mezzanines (labelled) right - 2x boxes with bench test OK FEE64 mezzanines bottom - untested FEE64 mezzanines Attachment 6 - AIDA FEE64 mezzanines to be re-tested Summary of AIDA FEE64 mezzanine bench tests (see Mezzanine logbooks for details) Garner Osborn Batch 7226-1 9 pass 11 pass 15 fail no signals? 16 fail power? 17 fail power? 19 pass 23 pass 24 fail asic#4 27 fail power? 30 fail power? 37 pass 39 pass 40 fail power? Batch 0213110101 26 fail asic#2 27 fail asic#3 29 pass Batch 0216240101 8 pass It is possible that the mezzanines have dirty electrical contacts - they should be cleaned and re-tested
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown