AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 90     Entry time: Sat May 2 02:04:50 2015
Author: JA, TD, AE, CG, VP & JLT 
Subject: Saturday 2 May 2015 

0055: Degrader changed. 1mm removed.

            1.4mm total

0537: R38 ends nnaida11 slow comparator 0x20 -> 0x40 LEC fast comparator -> 0xff

0530: R39 10.00 AIDA status screenshots

1159: R39 ends HEC fast comparator 0x2 -> 0xf (all FEE64s)

1202: R40 nnaida8 no SYNCS see attachments 19-22

           VFEP toggled merge pause state check merge activity spinner accelerates nnaida8 GO Electronics (from select required function menu of Run Control) nnaida8 started OK toggled merge pause state

1500: Attachments 23-28 show waveforms, low E and high E spectra for nnaida6+11.

           Increasing fast comp threshold to 0xf shifts position of energy cut off away from zero point, as expected, but does not remove low E peak around ch 32500.

1530: Increase bias to +150V on det 1 (ch 1). Attachments 29-34 show waveforms, low E and high E spectra with increased bias voltage. Diode link threshold at 0x23

           V high E events in .L spectra show reduction over those before bias increase.

           In .H spectra from both nnaida6+11, increased bias reduced threshold. Finite threshold still seen on n-side however (greater than on p-side).

           All references/comparisons in this ELog entry re. nnaida11 are w.r.t. to spectra/waveforms seen at this 'standard' setting.

1544: Changed diode link thresh on nnaida11 to 0x11. Attachments 35-37.

           Saved run R42.

           High energy spectra saw threshold increase of ~700ch, but no other changed were observed.

1555: Change nnaida11 diode link thresh to 0x29. Saved run R43. Attachments 38-40.

            Saw reduction in high E threshold by ~700 ch but no other obvious changes.

1610: Changed diode link thresh on nnaida11 to 0x14 and preAmp reference to 0x20. Saved run R44. Attachments 41-44.

            Waveforms look much worse, more flatlining that previously seen.

            High E spectra show marginally higher threshold. No significant change in low E spectra.

1630: Changed nnaida11 preAmp ref to 0x40 and diode link thresh to 0x38. Saved run R45. Attachments 45-47

           Waveforms look similar to original setting. High E spectra show no significant change.

          Low E spectra have small peak near 32k and v. wide stretching to top of FSR.

1643: Changed nnaida11 preAmp ref to 0x60 and diode link thresh to 0x58. Saved run R46. Attachments 48-50.

            Waveforms settled on ~7500 much more frequently, with most signals beginning and returning to ~7500.

            High E spectra thresh at ~33500 as it was with 'standard' setting.

            Low E spectra show vast reduction in high E rubbish, looking more like an exponential decay compared to previous wide 'mound'.

            Big improvement over previous settings. Will try all n-side FEE with these settings later.

1700: Changed nnaida11 diode link thresh to 0x5a. Saved run R47 (~2hr run during tea break and other work).

           0x60 HEC fast comparator threshold (all FEE64s except nnaida30) 0x02.

19.04 R47 ends Change BigRIPS setting from 110Zr to 88Ge

19.15 R48 Pulser walkthough BNC PB-4 amplitude 90,000-10,000 @ 10,000 step, freq 25Hz.

            nnaida7 showed no SYNCS.

            Used procedure described above (1202) - nnaida7 recovered OK

19.28 Started run R48 - pulser walkthrough.

            R48 ends OK..

1944: Changed fast comparator threshold on LEC for...

  • nnaida 1: 0xb -> 0x30
  • nnaida2: 0x18 -> 0x30
  • nnaida6: 0x10 -> 0x30
  • nnaida10: 0x10 -> 0x30
  • nnaida13: 0x12 -> 0x30
  • nnaida14: 0x14 -> 0x30

          Change, for all n-side FEE64s, preAmp reference from previous value to 0x60 and diode link thresh to 0x5a.

          Saved settings to /MIDAS/DB/EXPERIMENTS/AIDA/2015Apr30-diode-mod3

 (around) 20:30 pm: started data taking for 88Ge setting. First runs are with empty H target at MINOS/DALI for transmission measurement.

                                     Degrader also changed during run R50. Initially: 0.6mm + 0.4mm + (0.3 mm?) + 1mm. The 1mm degrader was removed after ~ 1hr of run.

 

2300: NNAIDA#11: changed Fast Comparator of Low Energy channels to 0x40. It was set at 0xFF, and no discriminator data being produced. Rate of ~12 kHz for discriminator events in NNAIDA#11 for this setting (comparable to other FEE64s).

 

         RUN: R51_* started after adjusting the NNAIDA11 setting

Attachment 1: 80.png  131 kB  | Hide | Hide all
80.png
Attachment 2: 81.png  10 kB  | Hide | Hide all
81.png
Attachment 3: 82.png  292 kB  | Hide | Hide all
82.png
Attachment 4: 83.png  293 kB  | Hide | Hide all
83.png
Attachment 5: 85.png  141 kB  | Hide | Hide all
85.png
Attachment 6: 87.png  141 kB  | Hide | Hide all
87.png
Attachment 7: 86.png  141 kB  | Hide | Hide all
86.png
Attachment 8: 88.png  88 kB  | Hide | Hide all
88.png
Attachment 9: 89.png  92 kB  | Hide | Hide all
89.png
Attachment 10: 90.png  90 kB  | Hide | Hide all
90.png
Attachment 11: 91.png  91 kB  | Hide | Hide all
91.png
Attachment 12: 92.png  213 kB  Uploaded Sat May 2 04:53:13 2015  | Hide | Hide all
92.png
Attachment 13: 93.png  224 kB  Uploaded Sat May 2 04:53:29 2015  | Hide | Hide all
93.png
Attachment 14: 94.png  228 kB  Uploaded Sat May 2 04:53:46 2015  | Hide | Hide all
94.png
Attachment 15: 95.png  217 kB  Uploaded Sat May 2 04:54:05 2015  | Hide | Hide all
95.png
Attachment 16: 96.png  119 kB  Uploaded Sat May 2 04:54:25 2015  | Hide | Hide all
96.png
Attachment 17: 97.png  119 kB  Uploaded Sat May 2 04:55:07 2015  | Hide | Hide all
97.png
Attachment 18: 98.png  288 kB  Uploaded Sat May 2 04:58:19 2015  | Hide | Hide all
98.png
Attachment 19: 99.png  130 kB  Uploaded Sat May 2 05:17:56 2015  | Hide | Hide all
99.png
Attachment 20: 100.png  151 kB  Uploaded Sat May 2 05:18:14 2015  | Hide | Hide all
100.png
Attachment 21: 101.png  100 kB  Uploaded Sat May 2 05:18:30 2015  | Hide | Hide all
101.png
Attachment 22: 102.png  72 kB  Uploaded Sat May 2 05:19:22 2015  | Hide | Hide all
102.png
Attachment 23: 20150502_nnaida11_fastcomp0xf.png  237 kB  Uploaded Sat May 2 07:46:36 2015  | Hide | Hide all
20150502_nnaida11_fastcomp0xf.png
Attachment 24: 20150502_nnaida6H_fastcomp0xf.png  243 kB  Uploaded Sat May 2 07:46:50 2015  | Hide | Hide all
20150502_nnaida6H_fastcomp0xf.png
Attachment 25: 20150502_nnaida11W.png  163 kB  Uploaded Sat May 2 08:00:52 2015  | Hide | Hide all
20150502_nnaida11W.png
Attachment 26: 20150502_nnaida6W.png  170 kB  Uploaded Sat May 2 08:01:16 2015  | Hide | Hide all
20150502_nnaida6W.png
Attachment 27: 20150502_nnaida11L.png  151 kB  Uploaded Sat May 2 08:01:32 2015  | Hide | Hide all
20150502_nnaida11L.png
Attachment 28: 20150502_nnaida6L.png  160 kB  Uploaded Sat May 2 08:01:47 2015  | Hide | Hide all
20150502_nnaida6L.png
Attachment 29: 20150502_nnaida11L_150V.png  159 kB  Uploaded Sat May 2 08:32:20 2015  | Hide | Hide all
20150502_nnaida11L_150V.png
Attachment 30: 20150502_nnaida6L_150V.png  151 kB  Uploaded Sat May 2 08:33:04 2015  | Hide | Hide all
20150502_nnaida6L_150V.png
Attachment 31: 20150502_nnaida11W_150V.png  167 kB  Uploaded Sat May 2 08:33:25 2015  | Hide | Hide all
20150502_nnaida11W_150V.png
Attachment 32: 20150502_nnaida6W_150V.png  174 kB  Uploaded Sat May 2 08:33:43 2015  | Hide | Hide all
20150502_nnaida6W_150V.png
Attachment 33: 20150502_nnaida11H_150V.png  206 kB  Uploaded Sat May 2 08:33:58 2015  | Hide | Hide all
20150502_nnaida11H_150V.png
Attachment 34: 20150502_nniada6H_150V.png  215 kB  Uploaded Sat May 2 08:34:18 2015  | Hide | Hide all
20150502_nniada6H_150V.png
Attachment 35: 20150502_nnaida11w_150v_diode0x11.png  165 kB  Uploaded Sat May 2 09:22:32 2015  | Hide | Hide all
20150502_nnaida11w_150v_diode0x11.png
Attachment 36: 20150502_nnaida11H_150V_diode0x11.png  180 kB  Uploaded Sat May 2 09:22:48 2015  | Hide | Hide all
20150502_nnaida11H_150V_diode0x11.png
Attachment 37: 20150502_nnaida11L_150V_diode0x11.png  163 kB  Uploaded Sat May 2 09:23:11 2015  | Hide | Hide all
20150502_nnaida11L_150V_diode0x11.png
Attachment 38: 20150502_nnaida11W_150V_diode0x29.png  171 kB  Uploaded Sat May 2 09:23:27 2015  | Hide | Hide all
20150502_nnaida11W_150V_diode0x29.png
Attachment 39: 20150502_nnaida11H_150V_diode0x29.png  209 kB  Uploaded Sat May 2 09:23:44 2015  | Hide | Hide all
20150502_nnaida11H_150V_diode0x29.png
Attachment 40: 20150502_nnaida11L_150V_diode0x29.png  161 kB  Uploaded Sat May 2 09:24:01 2015  | Hide | Hide all
20150502_nnaida11L_150V_diode0x29.png
Attachment 41: 20150502_nnaida11W_150V_diode0x14_preamp0x20.png  165 kB  Uploaded Sat May 2 09:24:30 2015  | Hide | Hide all
20150502_nnaida11W_150V_diode0x14_preamp0x20.png
Attachment 42: 20150502_nnaida11W_150V_diode0x14_preamp0x20_2.png  160 kB  Uploaded Sat May 2 09:24:47 2015  | Hide | Hide all
20150502_nnaida11W_150V_diode0x14_preamp0x20_2.png
Attachment 43: 20150502_nnaida11H_150V_diode0x14_preamp0x20.png  179 kB  Uploaded Sat May 2 09:25:02 2015  | Hide | Hide all
20150502_nnaida11H_150V_diode0x14_preamp0x20.png
Attachment 44: 20150502_nnaida11L_150V_diode0x14_preamp0x20.png  159 kB  Uploaded Sat May 2 09:25:30 2015  | Hide | Hide all
20150502_nnaida11L_150V_diode0x14_preamp0x20.png
Attachment 45: 20150502_nnaida11W_150V_diode0x38_preamp0x40.png  172 kB  Uploaded Sat May 2 09:40:10 2015  | Hide | Hide all
20150502_nnaida11W_150V_diode0x38_preamp0x40.png
Attachment 46: 20150502_nnaida11H_150V_diode0x38_preamp0x40.png  185 kB  Uploaded Sat May 2 09:40:28 2015  | Hide | Hide all
20150502_nnaida11H_150V_diode0x38_preamp0x40.png
Attachment 47: 20150502_nnaida11L_150V_diode0x38_preamp0x40.png  160 kB  Uploaded Sat May 2 09:40:45 2015  | Hide | Hide all
20150502_nnaida11L_150V_diode0x38_preamp0x40.png
Attachment 48: 20150502_nnaida11W_150V_diode0x58_preamp0x60.png  158 kB  Uploaded Sat May 2 09:56:30 2015  | Hide | Hide all
20150502_nnaida11W_150V_diode0x58_preamp0x60.png
Attachment 49: 20150502_nnaida11H_150V_diode0x58_preamp0x60.png  180 kB  Uploaded Sat May 2 09:56:46 2015  | Hide | Hide all
20150502_nnaida11H_150V_diode0x58_preamp0x60.png
Attachment 50: 20150502_nnaida11L_150V_diode0x58_preamp0x60.png  159 kB  Uploaded Sat May 2 09:57:03 2015  | Hide | Hide all
20150502_nnaida11L_150V_diode0x58_preamp0x60.png
ELOG V3.1.4-unknown