AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Mar 25 20:24:44 2025
Author
*
:
Subject
*
:
> This is a short list of things todo or check before the test beam time on 11.12.23 > Updated after 15:00 CET meeting > > 1. Replace water interlock > - Also allows testing of AIDA for 24h+ > > 2. Decide on snout configuration: 1 or 2 BB18s (plus BB7 plus bPlastic) > It is U so if we put 2 we could damage 2 instead of just 1 (of course we try to be careful) > To decide which bPlas is installed (only 1 will be bothered): Upstream is preferred by HA > Install Peter's light blocking frame between bPlastic and AIDA > > 3. Replace aida04 with a working FEE64 > Important as aida04 is in deadtime and not very useful > > 4. Investigate/replace aida06 > Less urgent because 2 strips and runs with 0 dead time > > 5. If 2 BB18s, add another 8 working FEE64s to the system > Note: Cannot do 2BB18s and 1BB7 (cannot power/cool 17 FEEs) > > 6. Test AIDA firmware fix for individual ASIC controls (especially if BB7<->AIDA will be tested) > BB7<->AIDA will not be tested probably, as PCB will not arrive. > Still good to check if possible > > 7. Decide on FEE to take pulser (assuming no distribution/inverter available) > Test implant response with pulser and SC41 trigger?
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown