09.19 Beam off on arrival, now back
R51 running
BigRIPS 88Ge setting
Degraders 4mm Al + 1.3mm Al variable, MINOS target filled
FEE64 temperatures OK
Julabo FL11006 recirculating chiller OK, operating temp +20 deg C
Detector HV OK
AIDA SYNC/PAUSE/RESUME rates OK
10.05 R51 ends
10.51 Change BigRIPS setting to 94Se
OR MACB triggers from nnaida1, 2, 6, 10, 13 & 14 input EURICA trigger module input #7
All nnaida1, 2, 6, 10, 13 & 14 fast discriminators currently disabled.
11.33 R53
BigRIPS 94Se setting
c. 15.54 EURICA DAQ LUPO timestamp reset
14.00 Degrader changed t0 4mm fixed + 0.7mm variable (Al) |