AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 96     Entry time: Mon May 4 01:27:56 2015
Author: JA, TD, AE, CG & JLT 
Subject: Monday 4 May 2015 
09.18 SN changed degrader to 5.7mm Al (4mm + all variable degraders + additional 1mm)

09.24 R53 continues

      DSSSD#1 I_L to 8.16uA
      FEE64 temps OK
      Julabo FL11006 recirculating chiller OK - op temp +20 deg C

      Example HEC ADC spectra DSSSD #1-3 (attachments 1-12) 

09.59 R53 ends 
      Beam off - problem with refrigeration plant for BigRIPS quads

10.39 FEE64 temperatures (attachment 13)

10.51 Check ALL ASIC Control parameters 

11.15 Stat and Hit spectra for all AIDA FEE64 modules (attachments 14-15)
      Illustrates common noisy channels for each FEE64 channels 1 & 55 of 0-63
   

11.28 R54 
      Short run without beam, BNC PB-4 pulser frequency ~1Hz

12.55 R54 ends OK

14.00 Plot of leakage currents up to now included.
      Gradual increase in all detectors over course of experiment.
      Bias voltage on detector 1 (ch 1) increased to +150V at 0900 on 03/05, causing 
      an increase in I_L over preceding value.

16.00 Beam expected 21.00

18.30 No beam.
      HV ch 2 tripped (det 3)
      Reset HV and observed expected leakage current

19.00 HV ch 1 also tripped.
      Increased HV to +150V. Leakage current @ 8.02uA
Attachment 1: 120.png  206 kB  Uploaded Mon May 4 02:41:47 2015  | Hide | Hide all
120.png
Attachment 2: 121.png  203 kB  Uploaded Mon May 4 02:42:05 2015  | Hide | Hide all
121.png
Attachment 3: 122.png  212 kB  Uploaded Mon May 4 02:42:27 2015  | Hide | Hide all
122.png
Attachment 4: 123.png  198 kB  Uploaded Mon May 4 02:42:44 2015  | Hide | Hide all
123.png
Attachment 5: 124.png  217 kB  Uploaded Mon May 4 02:43:27 2015  | Hide | Hide all
124.png
Attachment 6: 125.png  230 kB  Uploaded Mon May 4 02:43:41 2015  | Hide | Hide all
125.png
Attachment 7: 126.png  203 kB  Uploaded Mon May 4 02:43:59 2015  | Hide | Hide all
126.png
Attachment 8: 127.png  199 kB  Uploaded Mon May 4 02:44:50 2015  | Hide | Hide all
127.png
Attachment 9: 128.png  215 kB  Uploaded Mon May 4 02:54:01 2015  | Hide | Hide all
128.png
Attachment 10: 129.png  207 kB  Uploaded Mon May 4 02:54:24 2015  | Hide | Hide all
129.png
Attachment 11: 130.png  187 kB  Uploaded Mon May 4 02:54:40 2015  | Hide | Hide all
130.png
Attachment 12: 131.png  213 kB  Uploaded Mon May 4 02:54:55 2015  | Hide | Hide all
131.png
Attachment 13: 132.png  130 kB  Uploaded Mon May 4 03:39:21 2015  | Hide | Hide all
132.png
Attachment 14: 133.png  164 kB  Uploaded Mon May 4 04:14:47 2015  | Hide | Hide all
133.png
Attachment 15: 134.png  141 kB  Uploaded Mon May 4 04:15:09 2015  | Hide | Hide all
134.png
Attachment 16: leakage_curr.png  42 kB  Uploaded Mon May 4 09:31:07 2015  | Hide | Hide all
leakage_curr.png
ELOG V3.1.4-unknown