508
|
Wed Nov 30 21:26:52 2016 |
CG, DK, TD | Thursday 1 December | 00.51 BigRIPS data file 1112.
01.50 BigRIPS data file 1113.
|
10x |
|
507
|
Wed Nov 30 11:36:32 2016 |
TD | Offline analysis of R41_2 | Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 0.5mm/1mm Al + 1mm W/1m Al) variable
|
8x |
|
506
|
Wed Nov 30 11:10:10 2016 |
TD | Correlation_Check.c | cd /TapeData/RIBF03R1
~/td/a.out R31 10000 > /tmp/R31.out
~/td/a.out R31 24 > /tmp/R31-2.out
|
  |
|
505
|
Wed Nov 30 08:41:37 2016 |
PV, TD, RCF, Liu | Implantation profile in AIDA R39 37 to 46, after changing degrader at 16:23 |
Degrader setting:
Variable degrader:
0.5
mm W + 1 mm Al : in
0.3 mm W + 1 mm Al :
in
1 mm W + 1 mm Al : in
Fix degrader:
20mm |
  |
|
504
|
Wed Nov 30 06:42:01 2016 |
TD | Offline analysis of R39_26 | Following degrader change to (8mm Al) fixed
+ ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m
Al) variable
|
8x |
|
503
|
Wed Nov 30 06:33:52 2016 |
TD | Offline analysis R36_30 |
Following target change from (CH2)n to C
|
8x |
|
502
|
Wed Nov 30 06:31:04 2016 |
PV, TD, RCF, Liu | Implantation profile in AIDA R39 2 to 9, after changing degrader at 13:30 | Degrader setting was:
Variable degrader:
0.5 mm W + 1 mm Al : in
|
  |
|
501
|
Wed Nov 30 05:30:20 2016 |
TD | Offline analysis R39_6 |
Degrader 8mm Al fixed + ( 0.5mm W/1mm Al
+ 1mm W/1mm Al) variable
|
8x |
|
500
|
Wed Nov 30 04:56:40 2016 |
TD | Offline analysis R38_33 |
Degrader 8mm Al fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al) variable
|
9x |
|
499
|
Tue Nov 29 19:07:35 2016 |
AE, CG, ATS, AT | F11 conditions after change to C target in F8 [light particles?] | The main experiment changed to a carbon
reaction target at F8 (similar thickness
of CH2 previously used), and retuned the |
    |
|
498
|
Tue Nov 29 15:12:33 2016 |
CG, AE, TD, DK | Wednesday 30 November | 00.11 Beam stopped for target @F8 change.
R35 stopped at R35_62.
BRIKEN file 161129_1951 155->159
|
13x |
|
497
|
Tue Nov 29 12:21:35 2016 |
TD | Offline analysis R35_1 |
S O R T C O M P L E T E ..... Tue Nov |
8x |
|
496
|
Tue Nov 29 05:18:50 2016 |
TD | Offline analysis of R31 | Offline analysis of AIDA data files from R31_0
to c. R31_5 (elapsed time 1120.45s)
|
10x |
|
494
|
Mon Nov 28 18:07:14 2016 |
CG, TD, AE, DK | Tuesday 29 November | 01:39 : Attachment 26 (R30_70to72) shows a
gradual change in the hit pattern for DSSD2
(at the lower left
|
42x |
|
493
|
Mon Nov 28 15:53:39 2016 |
AE, AT, RG, CG | DAQ synchronization | We noticed a peculiar feature in the time-stamp
synchronization monitor. The spectra of timestamp
difference between pairs of DAQ systems show, |
7x |
|
492
|
Mon Nov 28 13:12:31 2016 |
PV, AE, Liu | Implantation profile in AIDA with 8mm Al replacing 3 mm Pb | Data for ~3 hrs: Nov 28th, 20:06 to 23:16
Bigrips run 1060 to 1062
AIDA run R30_ 2 to R30_40 |
    |
|
491
|
Mon Nov 28 11:55:20 2016 |
TD | Offline analysis R30_2 | Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al)
|
  |
|
490
|
Mon Nov 28 06:49:04 2016 |
DK | Offline analysis R27_1 | Conditions: One Pb wall with empty windows.
3mm Pb degrader closer to AIDA, on the front
of PE wall
|
  |
|
489
|
Mon Nov 28 05:38:39 2016 |
DK | Offline analysis R28_14 | Conditions: Two Pb walls with empty windows.
3mm Pb degrader between MUSIC 1 and MUSIC
2.
|
  |
|
488
|
Sun Nov 27 22:35:37 2016 |
Liu, PV, AE | Ion hit pattern in AIDA after degrader changing | After changing degrader to optimize 40Mg,
hit pattern in AIDA is shown in figure below.
The implantation position changed |
|