656
|
Sun Jun 11 16:04:12 2017 |
DK | Monday 12 June 0:00 ~ 8:00 | 0:04 Biases and leak currents shown as
attachment #1, 12JunBias1.png
System-wide checks: nnaida13 fails |
10x |
|
655
|
Sun Jun 11 08:23:23 2017 |
PV | Sunday 11 June 16:00-00:00 | 16:40 beam lost - stripper foil problem
AIDA file RIBF128/R9_55
|
21x |
|
654
|
Sun Jun 11 00:07:24 2017 |
OH | Sunday 11 June 08:00-16:00 | 08:10 BRIKEN and BigRIPS stops DAQs
AIDA on file R7_1287
|
25x |
|
653
|
Sat Jun 10 15:56:31 2017 |
ZLiu | 0:00-8:00 11 June 2017 |
00:35 Stop DAQ
AIDA file
RIBF128/R7_1172
00:36 Start DAQ
AIDA file RIBF128/R7_1172
BRIKEN |
46x |
|
652
|
Sat Jun 10 09:24:45 2017 |
AE, TD | Saturday 19 June 16.00-24.00 | 17.25 Detector biases & leakage currents OK
- see attachments 1 & 2
FEE64 Temperatures OK - see attachment |
24x |
|
651
|
Sat Jun 10 02:40:18 2017 |
DK | Sat 10 June 8:00 ~ 16:00 | 10:40 Put lead wall in front of AIDA during
beam tuning.
|
|
|
650
|
Fri Jun 9 16:22:54 2017 |
PV | Saturday 10 June 00:00-08:00 | 00:21 BigRIPS and BRIKEN stop their DAQ
AIDA run file R7_826
|
28x |
|
649
|
Fri Jun 9 09:12:03 2017 |
ZLiu, AE | 17:00-24:00 | 17:06 BRIKEN and BigRIPS stop their DAQs
AIDA on file R7_723
|
    |
|
648
|
Fri Jun 9 04:53:24 2017 |
TD | Waveforms |
x-scale 1000ch = 2ms
y-scale expanded
|
28x |
|
647
|
Thu Jun 8 23:57:26 2017 |
ZLiu, TD | 9June2017 8:00-16:00 |
08:06 System wide checks all ok
implantation profile - attachment
1
count rate - attachment 2
|
32x |
|
646
|
Thu Jun 8 16:06:21 2017 |
OH | Friday 9 June 00:00-08:00 | 00:06 System wide checks all ok
Bias and leakage currents ok - attachment
1
|
9x |
|
645
|
Thu Jun 8 08:11:39 2017 |
NN, PV | Thursday 8 June 16:00 - 24:00 (evening shift) | 16:13 DAQ still running
16:34 BigRIPS and BRIKEN stop their DAQ
|
22x |
|
644
|
Thu Jun 8 00:54:26 2017 |
OH, PW | Thursday 8 June 00:00-16-00 | 08:54 DAQ still running
09:01 BRIKEN and BigRIPS stop daqs
|
6x |
|
643
|
Wed Jun 7 16:04:42 2017 |
ZL, DK | Thurs 8 June 0:00~8:00 | 00:05 Shift change.
Primary beam current ~4800 enA, 238U^86+
so 50 to 60 pnA.
|
13x |
|
642
|
Wed Jun 7 08:02:42 2017 |
OH, PV | Wednesday 7 June 16:00 - 24:00 | 16:02 System wide checks ok
Good Events statistics (No beam at
time!)- attachment 1
|
15x |
|
641
|
Wed Jun 7 00:10:24 2017 |
NN, TD | Wednesday 7 June 08:00 - 16:00 | 08:12 Analysis of file RIBF128/R6_438 -
zero timewarps, four MBS timewarps - see
attachment 1
|
30x |
|
640
|
Tue Jun 6 15:59:19 2017 |
DK | Wed 7 June night shift | 7 June 2017
00:05 All system-wide checks are passed
|
14x |
|
639
|
Tue Jun 6 15:26:44 2017 |
TD, ZL | Tuesday 06 June 16.00-24.00 | 15.53 Bias and leakage currents ok - attachments
1 & 2
FEE temperatures ok - attachment |
29x |
|
637
|
Tue Jun 6 07:44:19 2017 |
TD | Preamplifier waveforms | Preamplifier waveforms sampled by 50MSPS,
14 bit ADC
|
25x |
|
636
|
Tue Jun 6 00:57:49 2017 |
PJW, TD | Tuesday 6 June 08.00-16.00 | 08.57 Stop DAQ
AIDA file RIBF128/R6_24
|
16x |