AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 15 of 46  ELOG logo
ID Date Author Subject Text Attachments
  656   Sun Jun 11 16:04:12 2017 DKMonday 12 June 0:00 ~ 8:000:04    Biases and leak currents shown as
attachment #1, 12JunBias1.png
        System-wide checks: nnaida13 fails
 10x 
  655   Sun Jun 11 08:23:23 2017 PVSunday 11 June 16:00-00:00 16:40 beam lost - stripper foil problem
      AIDA file RIBF128/R9_55
 21x 
  654   Sun Jun 11 00:07:24 2017 OHSunday 11 June 08:00-16:0008:10 BRIKEN and BigRIPS stops DAQs
      AIDA on file R7_1287
 25x 
  653   Sat Jun 10 15:56:31 2017 ZLiu0:00-8:00 11 June 2017
00:35   Stop DAQ
        AIDA file
RIBF128/R7_1172

00:36   Start DAQ
  
     AIDA file RIBF128/R7_1172
        BRIKEN
 46x 
  652   Sat Jun 10 09:24:45 2017 AE, TDSaturday 19 June 16.00-24.0017.25 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 24x 
  651   Sat Jun 10 02:40:18 2017 DKSat 10 June 8:00 ~ 16:0010:40    Put lead wall in front of AIDA during
beam tuning.
 R7_1002.txt 
  650   Fri Jun 9 16:22:54 2017 PVSaturday 10 June 00:00-08:0000:21  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_826
 28x 
  649   Fri Jun 9 09:12:03 2017 ZLiu, AE17:00-24:0017:06 BRIKEN and BigRIPS stop their DAQs
      AIDA on file R7_723
 leakage_jun9_6pm.pngstat_21.14.pngtemp2116.pngnnaida12_EL.pngnnaida9_EL.png 
  648   Fri Jun 9 04:53:24 2017 TDWaveforms
x-scale 1000ch = 2ms
y-scale expanded
 28x 
  647   Thu Jun 8 23:57:26 2017 ZLiu, TD9June2017 8:00-16:00
08:06 System wide checks all ok
 
       implantation profile - attachment

         count rate - attachment 2
 32x 
  646   Thu Jun 8 16:06:21 2017 OHFriday 9 June 00:00-08:0000:06 System wide checks all ok
      Bias and leakage currents ok - attachment
1
 9x 
  645   Thu Jun 8 08:11:39 2017 NN, PVThursday 8 June 16:00 - 24:00 (evening shift)16:13  DAQ still running

16:34  BigRIPS and BRIKEN stop their DAQ
 22x 
  644   Thu Jun 8 00:54:26 2017 OH, PWThursday 8 June 00:00-16-0008:54 DAQ still running

09:01 BRIKEN and BigRIPS stop daqs
 6x 
  643   Wed Jun 7 16:04:42 2017 ZL, DKThurs 8 June 0:00~8:0000:05  Shift change.
       Primary beam current ~4800 enA, 238U^86+
so 50 to 60 pnA.
 13x 
  642   Wed Jun 7 08:02:42 2017 OH, PVWednesday 7 June 16:00 - 24:0016:02 System wide checks ok
      Good Events statistics (No beam at
time!)- attachment 1
 15x 
  641   Wed Jun 7 00:10:24 2017 NN, TDWednesday 7 June 08:00 - 16:0008:12    Analysis of file RIBF128/R6_438 -
zero timewarps, four MBS timewarps - see
attachment 1
 30x 
  640   Tue Jun 6 15:59:19 2017 DKWed 7 June night shift7 June 2017   

00:05  All system-wide checks are passed
 14x 
  639   Tue Jun 6 15:26:44 2017 TD, ZLTuesday 06 June 16.00-24.0015.53    Bias and leakage currents ok - attachments
1 & 2 
         FEE temperatures ok - attachment
 29x 
  637   Tue Jun 6 07:44:19 2017 TDPreamplifier waveformsPreamplifier waveforms sampled by 50MSPS,
14 bit ADC
 25x 
  636   Tue Jun 6 00:57:49 2017 PJW, TDTuesday 6 June 08.00-16.0008.57 Stop DAQ
      AIDA file RIBF128/R6_24
 16x 
ELOG V3.1.4-unknown