Fri Dec 2 08:23:28 2016, TD, Offline analysis of R48_9   
|
Analysis of background, pulser off
S O R T C O M P L E T E ..... Fri Dec 2 17:11:14 2016
|
Fri Dec 2 06:41:25 2016, DK, Benchmarks for compression
|
R45_17 as the test file, which was closed at 9.02 AM Friday, December 2nd at the end of the official parasitic
machine time on Fallon et al.
|
Thu Dec 1 16:01:10 2016, CG, PV, Friday 2 December 14x
|
00.07 BigRIPS data file 1135
01.07 BigRIPS data file 1136.
|
Thu Dec 1 10:58:54 2016, PV, TD, Liu, Implantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129)  
|
|
Thu Dec 1 09:46:06 2016, TD, Offline analysis of R43_59 9x
|
Variable degrader setting is now #2 + #3: 0.3 mm W + 1.0 mm W [+2 mm Al]
Centre ZDS @ 40Mg
|
Thu Dec 1 08:13:06 2016, PV,Liu, TD, Implantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43  
|
Bigrips run 1127
AIDA run 43_ 33 to 43 |
Thu Dec 1 02:25:41 2016, DK, Offline analysis of R42_32 6x
|
Offline analysis of AIDA R42_32.
Degrader condition of F11 is with the same stopping power of e.g. R42_7 (see https://elog.ph.ed.ac.uk/AIDA/509).
|
Thu Dec 1 00:21:08 2016, DK, Offline analysis of R42_7    
|
Checking that the implantation is still reasonable after LN2 fill recovery.
Degrader condition is 8. + 0.2 mm Al on the upstream side of the PE wall.
All three variable degraders are in (0.5 mm W; 0.3 mm W; 1.0 mm W, each on 1 mm Al backing). |
Wed Nov 30 21:26:52 2016, CG, DK, TD, Thursday 1 December 10x
|
00.51 BigRIPS data file 1112.
01.50 BigRIPS data file 1113.
|
Wed Nov 30 11:36:32 2016, TD, Offline analysis of R41_2 8x
|
Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m Al) variable
Steering to F11 changed by PD
|
Wed Nov 30 11:10:10 2016, TD, Correlation_Check.c  
|
cd /TapeData/RIBF03R1
~/td/a.out R31 10000 > /tmp/R31.out
~/td/a.out R31 24 > /tmp/R31-2.out
|
Wed Nov 30 08:41:37 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 37 to 46, after changing degrader at 16:23  
|
Degrader setting:
Variable degrader:
0.5 mm W + 1 mm Al : in
0.3 mm W + 1 mm Al : in
1 mm W + 1 mm Al : in
Fix degrader:
20mm Al+ 0,2 mm Al
See
https://elog.ph.ed.ac.uk/AIDA/502 for comparison |
Wed Nov 30 06:42:01 2016, TD, Offline analysis of R39_26 8x
|
Following degrader change to (8mm Al) fixed + ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m Al) variable
S O R T C O M P L E T E ..... Wed Nov 30 17:13:45 2016
|
Wed Nov 30 06:33:52 2016, TD, Offline analysis R36_30 8x
|
Following target change from (CH2)n to C
|
Wed Nov 30 06:31:04 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 2 to 9, after changing degrader at 13:30  
|
Degrader setting was:
Variable degrader:
0.5 mm W + 1 mm Al : in
|
Wed Nov 30 05:30:20 2016, TD, Offline analysis R39_6 8x
|
Degrader 8mm Al fixed + ( 0.5mm W/1mm Al + 1mm W/1mm Al) variable
|
Wed Nov 30 04:56:40 2016, TD, Offline analysis R38_33 9x
|
Degrader 8mm Al fixed + ( 0.3mm W/1mm Al + 1mm W/1mm Al) variable
|
Tue Nov 29 19:07:35 2016, AE, CG, ATS, AT, F11 conditions after change to C target in F8 [light particles?]    
|
The main experiment changed to a carbon reaction target at F8 (similar thickness of CH2 previously used), and retuned the ZDS. First BigRIPS run after
retuning is 40Mg_1093 (at 2:29 am, Nov 30th)
The background at F11 has increased. The neutron backgroun incresead by a factor of ~10. The rates of visual scalers also increased; for example |
Tue Nov 29 15:12:33 2016, CG, AE, TD, DK, Wednesday 30 November 13x
|
00.11 Beam stopped for target @F8 change.
R35 stopped at R35_62.
BRIKEN file 161129_1951 155->159
|
Tue Nov 29 12:21:35 2016, TD, Offline analysis R35_1 8x
|
S O R T C O M P L E T E ..... Tue Nov 29 20:45:36 2016
|