AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 27 of 46  ELOG logo
Entry  Fri Nov 2 01:19:49 2018, TD, Offline analysis R9 - alpha background 7x
 
Offline analysis of Oct18/R9_0 to 17 (c. 46h data)
Entry  Sun Nov 4 04:31:49 2018, TD, Offline analysis R4 28x
Offline analysis of Oct18/R4_0 to _2

alpha background and pulser
Entry  Wed Nov 30 05:30:20 2016, TD, Offline analysis R39_6 8x

Degrader 8mm Al fixed + ( 0.5mm W/1mm Al + 1mm W/1mm Al) variable
Entry  Wed Nov 30 04:56:40 2016, TD, Offline analysis R38_33 9x

Degrader 8mm Al fixed + ( 0.3mm W/1mm Al + 1mm W/1mm Al) variable
Entry  Wed Nov 30 06:33:52 2016, TD, Offline analysis R36_30 8x

Following target change from (CH2)n to C
Entry  Tue Nov 29 12:21:35 2016, TD, Offline analysis R35_1 8x


S O R T    C O M P L E T E ..... Tue Nov 29 20:45:36 2016
Entry  Mon Nov 28 11:55:20 2016, TD, Offline analysis R30_2 20.png21.png22.png
Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al + 1mm W/1mm Al)

S O R T    C O M P L E T E ..... Mon Nov 28 20:53:02 2016
Entry  Mon Nov 28 05:38:39 2016, DK, Offline analysis R28_14 r28_14-2120.pngr28_14-2110.pngr28_14-307.png
Conditions: Two Pb walls with empty windows. 3mm Pb degrader between MUSIC 1 and MUSIC 2.

Variable degraders: 1.0 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)
Entry  Mon Nov 28 06:49:04 2016, DK, Offline analysis R27_1 r27_1-307.pngr27_1-2110.pngr27_1-2120.png
Conditions: One Pb wall with empty windows. 3mm Pb degrader closer to AIDA, on the front of PE wall

Variable degraders: 1.0 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)
Entry  Mon May 22 08:29:26 2017, TD, Offline analysis R25_12 to R25_22 21x
Offline analysis of AIDA data files R25_12 to R25_22 using MIDASsort

Note
Entry  Sun Nov 27 12:53:04 2016, TD, Offline analysis R24_3 20.png21.png22.png24.png


S O R T    C O M P L E T E ..... Sun Nov 27 20:32:48 2016
Entry  Fri Nov 9 02:26:58 2018, TD, Offline analysis R18, R27, R29 - alpha background 8x
Offline analysis of Oct18/R18_0 to 2, R27_0, 4 & 9, R29_0, 7 & 30

alpha background, BNC PB-4 pulser OFF, LEC/MEC slow comparator 0x64 (~1MeV)
Entry  Mon Nov 5 10:02:52 2018, TD, Offline analysis R16 - beam background 200.png201.png202.png203.png
Offline analysis of Oct18/R16_0 to 11

Entry  Sat Nov 3 00:49:22 2018, TD, Offline analysis R15 - beam background 50.png51.png52.png54.png55.png
Offline analysis of Oct18/R15_0 to 7

Entry  Thu Jun 21 05:23:16 2018, TD, OH, Offline analysis R1 - alpha background 8x

Analysis of overnight alpha background run (June18/R1_0 ... _2) indicates that all FEE64s and DSSSDs are
operating OK.
Entry  Fri Oct 27 08:35:33 2017, TD, Offline analysis Oct17/R17_31-R17_34 8x

Offline analysis of High Energy Channel (HEC) 20GeV FSR data from AIDA data file Oct17/R17_31-R17_34
Entry  Sat Oct 28 06:09:44 2017, TD, Offline analysis Oct17/R17_31-R17_34 20x
 
Entry  Sat Nov 18 03:53:43 2017, TD, Offline analysis Nov17/R2_8-R2_16 data  22x
MIDASsort offline analysis Nov17/R2_8-R2_16 data

N.B. 
Entry  Fri May 24 07:21:31 2019, TD, Offline analysis May19/R1, R2, R7, R8 & R9 11x

Offline analysis of alpha background data files May19/R1, R2, R7, R8, R9 ( c. 310h )
Entry  Mon Sep 15 13:51:28 2014, Patrick, Odd spectra from running nnaida2 for 3 hours nnaida2_3hours
 I'm running nnaida2 with the PB-5 and an old adaptor.(1pF)
I've seen spectra like this before but previously they have shown apparent digital relationship between the troughs. 
So maybe they show 3 peaks ? 
ELOG V3.1.3-7933898