AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 27 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Text Attachments
  758   Fri Nov 2 01:19:49 2018 TDOffline analysis R9 - alpha background 
Offline analysis of Oct18/R9_0 to 17 (c.
46h data)
 7x 
  764   Sun Nov 4 04:31:49 2018 TDOffline analysis R4Offline analysis of Oct18/R4_0 to _2

alpha background and pulser
 28x 
  501   Wed Nov 30 05:30:20 2016 TDOffline analysis R39_6
Degrader 8mm Al fixed + ( 0.5mm W/1mm Al
+ 1mm W/1mm Al) variable
 8x 
  500   Wed Nov 30 04:56:40 2016 TDOffline analysis R38_33
Degrader 8mm Al fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al) variable
 9x 
  503   Wed Nov 30 06:33:52 2016 TDOffline analysis R36_30
Following target change from (CH2)n to C
 8x 
  497   Tue Nov 29 12:21:35 2016 TDOffline analysis R35_1

S O R T    C O M P L E T E ..... Tue Nov
 8x 
  491   Mon Nov 28 11:55:20 2016 TDOffline analysis R30_2Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al)
 20.png21.png22.png 
  489   Mon Nov 28 05:38:39 2016 DKOffline analysis R28_14Conditions: Two Pb walls with empty windows.
3mm Pb degrader between MUSIC 1 and MUSIC
2.
 r28_14-2120.pngr28_14-2110.pngr28_14-307.png 
  490   Mon Nov 28 06:49:04 2016 DKOffline analysis R27_1Conditions: One Pb wall with empty windows.
3mm Pb degrader closer to AIDA, on the front
of PE wall
 r27_1-307.pngr27_1-2110.pngr27_1-2120.png 
  583   Mon May 22 08:29:26 2017 TDOffline analysis R25_12 to R25_22Offline analysis of AIDA data files R25_12
to R25_22 using MIDASsort
 21x 
  485   Sun Nov 27 12:53:04 2016 TDOffline analysis R24_3

S O R T    C O M P L E T E ..... Sun Nov
 20.png21.png22.png24.png 
  771   Fri Nov 9 02:26:58 2018 TDOffline analysis R18, R27, R29 - alpha backgroundOffline analysis of Oct18/R18_0 to 2, R27_0,
4 & 9, R29_0, 7 & 30
 8x 
  766   Mon Nov 5 10:02:52 2018 TDOffline analysis R16 - beam backgroundOffline analysis of Oct18/R16_0 to 11

 200.png201.png202.png203.png 
  761   Sat Nov 3 00:49:22 2018 TDOffline analysis R15 - beam backgroundOffline analysis of Oct18/R15_0 to 7

 50.png51.png52.png54.png55.png 
  717   Thu Jun 21 05:23:16 2018 TD, OHOffline analysis R1 - alpha background
Analysis of overnight alpha background run
(June18/R1_0 ... _2) indicates that all FEE64s
 8x 
  686   Fri Oct 27 08:35:33 2017 TDOffline analysis Oct17/R17_31-R17_34
Offline analysis of High Energy Channel (HEC)
20GeV FSR data from AIDA data file Oct17/R17_31-R17_34
 8x 
  688   Sat Oct 28 06:09:44 2017 TDOffline analysis Oct17/R17_31-R17_34   20x 
  702   Sat Nov 18 03:53:43 2017 TDOffline analysis Nov17/R2_8-R2_16 data MIDASsort offline analysis Nov17/R2_8-R2_16
data
 22x 
  811   Fri May 24 07:21:31 2019 TDOffline analysis May19/R1, R2, R7, R8 & R9
Offline analysis of alpha background data
files May19/R1, R2, R7, R8, R9 ( c. 310h
 11x 
  6   Mon Sep 15 13:51:28 2014 PatrickOdd spectra from running nnaida2 for 3 hours I'm running nnaida2 with the PB-5
and an old adaptor.(1pF)
I've seen spectra like this before
 nnaida2_3hours 
ELOG V3.1.3-7933898