AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 32 of 46  ELOG logo
ID Date Authordown Subject
  777   Mon Nov 12 14:51:44 2018 OHTuesday 13 November 00:00 - 08:00
00:00 AIDA currently on file R5_38
      BRIKEN on file 181112_2321_165Pm_019.dlt (AIDA file at start R5_33)
      BigRIPS run 1004



00:23 BRIKEN stop file
      AIDA Currently on file R5_43
      
00:26 BRIKEN start 181113_0025_165Pm_020.dlt 
      BigRIIPS start 1005
      AIDA Currently on file R5_43

     System wide checks ok

01:13 Bias and leakage currents ok - attchment 1
      Stats ok - attachment 2
      FEE Temps ok - attachment 3

01:21 BigRIPS and BRIKEN stop
      AIDA on file R5_52

01:25 BigRIPS starts run 1006
      BRIKEN starts run 181113_0123_165Pm_021.dlt
      AIDA on file R5_53

02:21 BigRIPS and BRIKEN stop
      AIDA on file R5_62

02:23 BigRIPS starts run 1007
      BRIKEN starts run 181113_0222_165Pm_022.dlt
      AIDA on file R5_62

      ASIC load check ok

03:15 Beam dropped out unsure for how long but is now back

03:21 BigRIPS and BRIKEN stopped
      AiDA on file R5_71
      
03:23 BigRIPS starts run 1008
      BRIKEN starts run 181113_0320_165Pm_023.dlt
      AIDA on file R5_71

03:45 Output of analyser on R5_70 - attachment 4

03:59 System wide checks ok
      FEE Temps ok - attachment 5
      Statistics ok - attachment 6


04:21 BigRIPS and BRIKEN stop
      AIDA on file R5_81

04:23 BigRIPS starts run 1009
      BRIKEN starts run 181113_0421_165Pm_024.dlt
      AIdA on file R5_81

05:19 BigRIPS and BRIKEN stop
      AIDA on file R5_90

05:20 BigRIPS start run 1010
      BRIKEN starts run 181113_0520_165Pm_025.dlt
      AIDA on file R5_90

05:49 System wide checks all ok
      Stats ok - attachment 7
      FEE Temps ok - attchment 8
      Bias and leakage currents ok - attachment 9

      High energy hit pattern per dssd - attachment 10
      Low energy Ex vs Ey plot per dssd - attachment 11
      High energy Ex vs Ey plot per dssd - attachment 12
      Also using the previously merged files produced from Phong's sort have confirmed that there is no to
      little punch through on DSSD3
      Did this through the use of a 2d plot of energy DSSD 3 vs the velocity

06:21 BigRIPS and BRIKEN stop
      AIDA on file R5_100

06:23 BigRIPS starts run 1011
      BRIKEN starts run 181113_0622_165Pm_026.dlt
      AIDA on file R5_100

07:19 BigRIPS and BRIKEN stop
      AIDA on file R5_110

07:20 BigRIPS starts run 1012
      BRIKEN starts run
      AIDA on file R5_110 
  786   Thu Nov 15 06:52:09 2018 OHThursday 15th November 16:00 - 24:00
15:51 DAQ continues - AIDA file RIBF148/R5_664
      165Pm BigRIPS setting + 2.8mm Al degrader

      ASIC settings 2018Oct03-13.26.58
       from c. 09.00 13.11.18
       n+n FEE64s Ibias LF feedback 0xb -> 0xd
       HEC fast comparator threshold 0x20 -> 0xff

15:52 Beam out due to power fault somewhere.

15:53 Beam back
      BRIKEN and BigRIPS start
      BRIKEN file 181115_1553_165Pm_085.dlt  
      BigRIPS run 1070
      AIDA on run R5_664

16:00 System wide checks all ok *Except nnaida7 fails adc calibration*
      Leakage currents and bias ok - attachment 1
      FEE Temps ok - attachment 2
      Statistics ok - attachment 3

16:54 BRIKEN and BigRIPS stop
      AIDA on file R5_675

16:55 BRIKEN starts run 181115_1654_165Pm_086.dlt
      BigRIPS starts run 1071
      AIDA on file R5_675

17:30 BRIKEBN and BigRIPS stop for BigRIPS team to get access

13:46 BRIKEN sends sync pulse resetting timestamp
      AIDA on file R5_683

17:49 BRIKEN starts run 181115_1748_165Pm_087.dlt
      bigRIPS starts run 1072
      AIDA on file R5_683

18.00 System wide checks ok, except nnaida7 ADC calibration failure
      FEE64 Temperatures ok (attachment 4)
      Good event statistics ok (attachment 5)
      Detector bias/Leakage currents ok (attachment 6)

18.04 Merger and TapeServer run ok - no error messages in terminals (attachments 7 and 8)

18:48 BigRIPS and BRIKEN stop
      AIDA on file R5_693

18:49 BigRIPS starts run 1073
      BRIKEN starts run 181115_1849_165Pm_088.dlt
      AIDA on file R5_693

19:47 BgiRIPS and BRIKEN stop
      AIDA on file R5_703

19:48 BigRIPS starts run 1074
      BRIKEN starts run 181115_1947_165Pm_089.dlt  
      AIDA on file R5_703

20:54 bigRIPS and BRIKEN stop
      AIDA on file R5_714

20:55 bigRIPS starts run 1075
      BRIKEN starts run 181115_2053_165Pm_090.dlt
      AIDA on file R5_714

21:25 System wide checks all ok *Except nnaida 7 fails adc calibration*
      Bias and leakage currents ok - attachment 9
      FEE Temps all ok - attachment 10
      Statistics ok - attachment 11

21:55 BRIKEN and BigRIPS stop
      AIDA on file R5_724

21:56 BigRIPS starts on run 1076
      BRIKEN starts run
      AIDA on file R5_724

22:55 BigRIPS and BRIKEN stop
      AIDA on file R5_733

22:56 BRIKEN Starts run
      BigRIPS starts run 1077
      AIDA on file R5_733

23.53 Briken stops
      AIDA on file R5_743

23.55 BRIKEN starts
      bigRIPS run 1078
      BRIKEN starts run 93
      AIDA on file R5_743
  792   Tue Mar 26 14:02:59 2019 OHInventory to be shipped back
Inventory is currently packaged up under the AIDA desk in B3F


2 FEE64 Modules

Module 1 - MAC Addresses
2B:33:15
2B:22:6E <- Loose HDMI

Module 2 - MAC Addresses
2B:09:DA <- ASIC #1 HEC Hot Channel, LEC noisy
2B:11:C5 <- Missing ASIC

MACB A-MP 202394 -2    72-38

MACB RevB Ser38 AMP 202394-2

MACB RevB AMP 202394-2   81-49
  641   Wed Jun 7 00:10:24 2017 NN, TDWednesday 7 June 08:00 - 16:00
08:12    Analysis of file RIBF128/R6_438 - zero timewarps, four MBS timewarps - see attachment 1

08:23    Online analysis (per DSSSD rates) of R6_443,  see attachment 2

08:35    BigRIPS and BRIKEN stop their DAQ
         AIDA run file R6_446

08:40    BRIKEN starts run 043
         BigRIPS starts run 3040
         AIDA on file R6_448

09:16    *All* system wide checks OK 
         FEE64 Temperatures OK - see attachment 3
         Good events statistics OK - see attachment 4 
         Detector biases & leakage currents OK - see attachment 5
         Merger and tape server running - see attachment 6,7 

09:51    Beam is OFF, RC is down

09:53    BigRIPS and BRIKEN stop their DAQ
         AIDA run file R6_470

10:00    Beam is ON

10:01    BRIKEN starts run 044
         BigRIPS starts run 3041
         AIDA on file R6_472

10:07    AIDA DAQ crashed (fuse blown)
         AIDA on file R6_474

10:14    BigRIPS and BRIKEN stop their QAD
         AIDA on file R6_474
         
10:25  E17/F11 ambient temperature +24.3 deg C, RH 42.7%, d.p. +10.9 deg C
       Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level OK (c. 75%)

       BNC PB-4 analogue output BNC T replaced by BNC-Lemo00 adaptor and Lemo00 T 
         
11:08    AIDA DAQ running (recovered) 

11:10    BRIKEN starts run 045
         BigRIPS starts run 3043
         AIDA on file R7_1
         (BigRIPS run 3042 was used to check synchronization) 

11:21    *All* system wide checks OK 
         FEE64 Temperatures OK - see attachment 8
         Good events statistics OK - see attachment 9 
         Detector biases & leakage currents OK - see attachment 10
         Merger and tape server running - see attachment 11,12 

11:28    Analysis of file RIBF128/R7_4 - zero timewarps, two MBS timewarps - see attachment 13

12:13    BigRIPS and BRIKEN stop their DAQ
         AIDA run file R7_16

12:13    BRIKEN starts run 046
         BigRIPS starts run 3044
         AIDA on file R7_17     

12:21    Analysis of file RIBF128/R7_15 - zero timewarps, two MBS timewarps - see attachment 14    

12:23    High Energy Correlation spectra - see attachment 15
         AIDA on file R7_20
         
13.00 Detector biases & leakage currents OK - see attachments 16 & 17
      FEE64 Temperatures OK - see attachment 18
      good events statistics OK - see attachment 19
      No warnings/errors reported by merger since DAQ GO - see attachment 20

      *all* system wide checks OK

13.06 analysis of file RIBF128/R7_30 - dead time < 0.5%, 0 ts & 1 MBS timewarps - see attachment 21

13.10 online analysis - ADC data synchronised - see attachment 22
      per DSSSD HEC x versus y spectra - see attachment 23
      per DSSSD HEC E_p versus E_n spectra - see attachment 24

13.12 per DSSSD rates file RIBF128/R7_33

 *** DSSSD # 1 count:    100283 old count:     52419 dt:      1.00 s  LEC rate:  47699.10 Hz
 *** DSSSD # 2 count:    143318 old count:     73956 dt:      1.00 s  LEC rate:  69123.04 Hz
 *** DSSSD # 3 count:     61925 old count:     31310 dt:      1.00 s  LEC rate:  30509.53 Hz
 *** DSSSD # 4 count:     42834 old count:     21364 dt:      1.00 s  LEC rate:  21396.03 Hz
 *** DSSSD # 5 count:     10974 old count:      5692 dt:      1.00 s  LEC rate:   5263.80 Hz
 *** DSSSD # 6 count:     29846 old count:     15307 dt:      1.00 s  LEC rate:  14488.91 Hz
 *** DSSSD # 1 count:         3 old count:         1 dt:      1.00 s  HEC rate:      1.99 Hz
 *** DSSSD # 2 count:        34 old count:        23 dt:      1.00 s  HEC rate:     10.96 Hz
 *** DSSSD # 3 count:        96 old count:        51 dt:      1.00 s  HEC rate:     44.84 Hz
 *** DSSSD # 4 count:        85 old count:        51 dt:      1.00 s  HEC rate:     33.88 Hz
 *** DSSSD # 5 count:         8 old count:         4 dt:      1.00 s  HEC rate:      3.99 Hz
 *** DSSSD # 6 count:         8 old count:         4 dt:      1.00 s  HEC rate:      3.99 Hz

       all SortSas spectra & histograms zero'd

13.13  DAQ stop
       AIDA run file R7_33

13.15  BRIKEN starts run 47
       BigRIPS starts run 3045 *** N.B. by mistake BRIKEN DAQ not actually started ***
       AIDA on file R7_ 33  

       BNC PB-4
       Amplitude 90,000
       x5 attenuator IN
       t_r 100ns tau_d 50us
       - polarity
       frequency 25Hz range
       delay MIN, tail pulse, INT ref

       ASIC settings 2017Mar27-16.12.39

       84Zn BigRIPS setting, 130Ag degrader setting - 2mm Al (in F7) + 3mm fixed + 1mm variable (in F11) = 6 mm Al

13.23  Beam stop to fix problem with STQ
       DAQ stop
       AIDA file RIBF128/R7_35

14:00  Beam is ON
       AIDA file R7_43

14:01  BRIKEN starts run 48
       BigRIPS starts run 3046
       AIDA on file R7_ 44  

14:48  Detector biases & leakage currents OK - see attachment 25

14:56  *All* system wide checks OK 
       FEE64 Temperatures OK - see attachment 26
       Good events statistics OK - see attachment 27 
       Merger and tape server running - see attachment 28,29 

15:16  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_64


15:25  Analysis of file RIBF128/R7_60 - zero timewarps, zero MBS timewarps - see attachment 30
  645   Thu Jun 8 08:11:39 2017 NN, PVThursday 8 June 16:00 - 24:00 (evening shift)
16:13  DAQ still running

16:34  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_388

16:36  BRIKEN starts run 069
       BigRIPS starts run 3072
       AIDA on file R7_389

16:37  Analysis of file RIBF128/R7_387 - zero timewarps, four MBS timewarps - see attachment 1

16:41  Beam is OFF 

16:43  Beam is ON

17:04  *All* system wide checks OK 
       FEE64 Temperatures OK - see attachment 2
       Good events statistics OK - see attachment 3 
       Merger and tape server running - see attachment 4,5 

17:06  Detector biases & leakage currents OK - see attachment 6

17:37  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_402

17:40  BRIKEN starts run 070
       BigRIPS starts run 3073
       AIDA on file R7_403

18:32  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_415

18:34  BRIKEN starts run 071
       BigRIPS starts run 3074
       AIDA on file R7_416

18:36  Offline Analysis of file RIBF128/R7_412 - zero timewarps, zero mbs timewarps - see attachment 7

18:58  *All* system wide checks OK 
       FEE64 Temperatures OK - see attachment 8
       Good events statistics OK - see attachment 9 
       Merger and tape server running - see attachment 10,11
       Detector biases and leakage currents OK - see attachment 12

19:34  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_428

19:35  BRIKEN starts run 072
       BigRIPS starts run 3075
       AIDA on file R7_429

20:08  Offline Analysis of file RIBF128/R7_434 - zero timewarps, one mbs timewarps - see attachment 13

20:10  High Energy Correlation spectra - see attachment 14
       AIDA on file R7_436

20:37  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_442

20:37  BRIKEN starts run 073
       BigRIPS starts run 3076
       AIDA on file R7_443

21:37  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_455

21:38  BRIKEN starts run 074
       BigRIPS starts run 3077
       AIDA on file R7_455


22:00  *All* system wide checks OK 
       FEE64 Temperatures OK - see attachment 15
       Good events statistics OK - see attachment 16
       Merger and tape server running - see attachment 17,18
       Detector biases and leakage currents OK - see attachment 19

22:10  Offline Analysis of file RIBF128/R7_434 - zero timewarps, one mbs timewarps of FEE No.6 - see attachment 20

22:26 High energy hit pattern - see attachment 21
      AIDA on file 466
      Zero'd online spectra

22:39  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_469

22:40  BRIKEN starts run 075
       BigRIPS starts run 3078
       AIDA on file R7_470

23:42  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_483

23:43  BRIKEN starts run 076
       BigRIPS starts run 3079
       AIDA on file R7_484

23:47  Offline Analysis of file RIBF128/R7_480 - zero timewarps, one mbs timewarps - see attachment 22
  631   Sun Jun 4 16:00:49 2017 NN, OHMonday 5 June 00:00 to 08:00
23:59   BigRIPS and Briken stop their DAQ
        AIDA run file R2_245

00:01   BRIKEN starts run 17
        BigRIPS starts run 2016
        AIDA on file R2_246

00:25   Analysis of file RIBF148/R2_250 - zero timewarps, four MBS timewarps - see attachment 1

00:37   per DSSSD rates file RIBF148/R2_250

*** DSSSD # 1 count:    768684 old count:    723417 dt:      1.03 s  LEC rate:  43913.93 Hz
 *** DSSSD # 2 count:   1122273 old count:   1056622 dt:      1.03 s  LEC rate:  63688.64 Hz
 *** DSSSD # 3 count:    427162 old count:    402923 dt:      1.03 s  LEC rate:  23514.48 Hz
 *** DSSSD # 4 count:    338200 old count:    317183 dt:      1.03 s  LEC rate:  20388.79 Hz
 *** DSSSD # 5 count:    204859 old count:    191893 dt:      1.03 s  LEC rate:  12578.44 Hz
 *** DSSSD # 6 count:    327506 old count:    307098 dt:      1.03 s  LEC rate:  19797.99 Hz
 *** DSSSD # 1 count:         3 old count:         3 dt:      1.03 s  HEC rate:      0.00 Hz
 *** DSSSD # 2 count:        46 old count:        43 dt:      1.03 s  HEC rate:      2.91 Hz
 *** DSSSD # 3 count:         7 old count:         6 dt:      1.03 s  HEC rate:      0.97 Hz
 *** DSSSD # 4 count:        32 old count:        30 dt:      1.03 s  HEC rate:      1.94 Hz
 *** DSSSD # 5 count:        77 old count:        72 dt:      1.03 s  HEC rate:      4.85 Hz
 *** DSSSD # 6 count:      1873 old count:      1748 dt:      1.03 s  HEC rate:    121.26 Hz

01:00   BigRIPS and BRIKEN stop their DAQ
        AIDA run file R2_262

01:02   BRIKEN starts run 18
        BigRIPS starts run 2017
        AIDA on file R2_263

01:43   Beam is OFF

01:45   Beam is ON

02:00   BigRIPS and BRIKEN stop their DAQ
        AIDA run file R2_278

02:04   BRIKEN starts run 19
        BigRIPS starts run 2018
        AIDA on file R2_280

02:28   *All* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (status=6)
        FEE64 Temperatures OK - see attachment 2
        Good events statistics OK - see attachment 3 
        Detector biases & leakage currents OK - see attachment 4
        Merger and tape server still running - see attachment 5, 6

02:35   High energy correlation between x and y attachment 7
        AIDA run R2_288

03:02   BigRIPS and BRIKEN stop their DAQ
        AIDA run file R2_295

03:02   BRIKEN starts run 20
        BigRIPS starts run 2019
        AIDA on file R2_296

03:52    Analysis of file RIBF148/R2_305 - zero timewarps, two MBS timewarps - see attachment 8

03:59   BigRIPS and BRIKEN stop their DAQ
        AIDA run file R2_311

04:02   BRIKEN starts run 21
        BigRIPS starts run 2020
        AIDA on file R2_312

04:59   BigRIPS and BRIKEN stop their DAQ
        AIDA run file R2_328

05:02   BRIKEN starts run 22
        BigRIPS starts run 2021
        AIDA on file R2_329

05:11   *All* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (status=6)
        FEE64 Temperatures OK - see attachment 9
        Good events statistics OK - see attachment 10 
        Detector biases & leakage currents OK - see attachment 11
        Merger and tape server still running,No warnings/errors- see attachment 12, 13, 14

05:23   Analysis of file RIBF148/R2_332 - zero timewarps - see attachment 15

05:58   BigRIPS and BRIKEN stop their DAQ
        AIDA run file R2_344

05:59   BRIKEN starts run 23
        BigRIPS starts run 2022
        AIDA on file R2_345

07:00   BigRIPS and BRIKEN stop their DAQ
        AIDA run file R2_361

07:05   BRIKEN starts run 24
        BigRIPS starts run 2023
        AIDA on file R2_362

07:06   Detector biases & leakage currents OK - see attachment 16

07:12   All system wide checks OK except ADC calibration of nnaida1, 21 and nnaida clock status (status = 6)
        FEE64 temperature OK - see attachment 17
        Good event statistics OK - see attachment 18
        Merger and tape server running, No warning/errors 

07:17   Analysis of file RIBF148/R2_364 - zero timewarps, three MBS timewarps - see attachment 19
        
  617   Wed May 31 08:00:26 2017 NN, CBWednesday 31 May 16:00 - 24:00
16:30  Check online data ok (R1_533) see attachment 1

16:39  BigRips and BRIKEN stop their runs
       AIDA on file R1_550

16:43  Beam is off

16:47  All degraders completely removed 
       Beam on 
       current AIDA run R1_551

16:48  BRIKEN start run 40
       BigRIPS start run 1041
       AIDA on file R1_551

16:57  BigRIPS and BRIKEN stop their runs
       AIDA on file R1_554
       high energy correlation between x and y attachment 2 

16:57  Beam is off
       Degrader back to its place, thickness 14 mm

17:00  Checked chiller level - 50% 

17:01  Beam is on

17:02  BRIKEN start run 41
       BigRIPS start run 1042
       AIDA on file R1_555

17:16  FEE's temperature normal
       statistics normal
       system wide checks ok 
       leakage current and bias ok see attachment 3
       merger and tapeserver ok

17:17  high energy correlation between x and y attachment 4 
       current AIDA run R1_558

18:02  Beam is off
       current AIDA file Run R1_570
       BigRIPS and BRIKEN stop their runs

       RH = 41.3%, T=24.3 C, DP=10.3 C
       Degrader now 5 (in F7) + 6 (in F11) + 3 (in F11) = 14 mm
       Refilled chiller - >95%

18:42  Beam is on

18:57  The optimization of beam tuning is going on       

19:20  Optimization of beam done

19.28 BRIKEN start run 42
      BigRIPS start run 1053
      AIDA on file R1_588

      BNC PB-4
      Amplitude 90,000
      x5 attenuator IN
      t_r 100ns tau_d 50us
      - polarity
      frequency 25Hz range
      delay MIN, tail pulse, INT ref

      ASIC settings 2017Mar27-16.12.39

      84Zn degrader setting - 5mm (in F7) + 6mm (in F11) + 3mm (in F11) = 14 mm 

19.41 Detector biases; leakage currents OK - see attachments 5 & 6
      FEE64 Temperatures OK - see attachment 7
      good events statistics OK - see attachment 8
      No warnings/errors reported by merger since DAQ GO - see attachment 9

      *all* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (status=6)

20.19 DAQ stops 
      AIDA file RIBF127R1/R1_601
      
      analysis of R1_601 dead time <0.5% - see attachment 10
      online analysis - ADC data synchronised - see attachment 12 

      online analysis per FEE64 HEC x versus y - attachment 11 mid-run - all SortSas spectra cleared -
attachment 13 end of run
      why does x-y distribution appear to change?
      distributions centred OK but now broader in x

20.20-20.39 various variable degrader settings to establish approximate degrader setting for 78Ni

20.39 BRIKEN start run 44
      BigRIPS start run 1054
      AIDA on file R1_606

      78Ni degrader setting (to be checked) 5mm Al (fixed F7) + 9mm Al (fixed F11) + 1mm Al (variable F11) = 15mm Al

      Offline sort of R1_602 for rates

 *** DSSSD # 1 count:    156234 old count:    115866 dt:      1.04 s  LEC rate:  38664.03 Hz
 *** DSSSD # 2 count:    205986 old count:    152716 dt:      1.04 s  LEC rate:  51021.42 Hz
 *** DSSSD # 3 count:     72980 old count:     54270 dt:      1.04 s  LEC rate:  17920.23 Hz
 *** DSSSD # 4 count:     63677 old count:     45811 dt:      1.04 s  LEC rate:  17111.86 Hz
 *** DSSSD # 5 count:     24253 old count:     17204 dt:      1.04 s  LEC rate:   6751.45 Hz
 *** DSSSD # 6 count:     48843 old count:     34242 dt:      1.04 s  LEC rate:  13984.68 Hz
 *** DSSSD # 1 count:        75 old count:        52 dt:      1.04 s  HEC rate:     22.03 Hz
 *** DSSSD # 2 count:       114 old count:        82 dt:      1.04 s  HEC rate:     30.65 Hz
 *** DSSSD # 3 count:       118 old count:        78 dt:      1.04 s  HEC rate:     38.31 Hz
 *** DSSSD # 4 count:       107 old count:        67 dt:      1.04 s  HEC rate:     38.31 Hz
 *** DSSSD # 5 count:        54 old count:        30 dt:      1.04 s  HEC rate:     22.99 Hz
 *** DSSSD # 6 count:         4 old count:         4 dt:      1.04 s  HEC rate:      0.00 Hz

20.50 all online histograms zero'd

21:21 analysed run from R1_588 to R1_601, couldn't find any timewraps. 

21:41  BigRips and BRIKEN stop their runs
       AIDA on file R1_620

21:44  BRIKEN start run 45
       BigRIPS start run 1055
       AIDA on file R1_621

22:04  FEE's temperature normal
       statistics normal
       system wide checks ok 
       leakage current and bias ok see attachment 14
       merger and tapeserver ok

22:41  BigRips and BRIKEN stop their runs
       AIDA on file R1_634

22:43  BRIKEN start run 46
       BigRIPS start run 1056
       AIDA on file R1_635

Offline sort of R1_635 for rates

 *** data items:    3524688 ( 108739.47 Hz)
 *** ADC events:     372675 (  11497.32 Hz)
 *** time warps:          0 (      0.00 Hz)
 *** DSSSD # 1 count:    160274 old count:    151136 dt:      3.43 s  LEC rate:  46708.84 Hz
 *** DSSSD # 2 count:    216907 old count:    205441 dt:      3.43 s  LEC rate:  63213.47 Hz
 *** DSSSD # 3 count:     74841 old count:     71214 dt:      3.43 s  LEC rate:  21811.00 Hz
 *** DSSSD # 4 count:     67870 old count:     63212 dt:      3.43 s  LEC rate:  19779.44 Hz
 *** DSSSD # 5 count:     25688 old count:     23773 dt:      3.43 s  LEC rate:   7486.28 Hz
 *** DSSSD # 6 count:     52420 old count:     48302 dt:      3.43 s  LEC rate:  15276.82 Hz
 *** DSSSD # 1 count:        73 old count:        69 dt:      3.43 s  HEC rate:     21.27 Hz
 *** DSSSD # 2 count:       137 old count:       131 dt:      3.43 s  HEC rate:     39.93 Hz
 *** DSSSD # 3 count:       141 old count:       130 dt:      3.43 s  HEC rate:     41.09 Hz
 *** DSSSD # 4 count:       141 old count:       130 dt:      3.43 s  HEC rate:     41.09 Hz
 *** DSSSD # 5 count:        47 old count:        41 dt:      3.43 s  HEC rate:     13.70 Hz
 *** DSSSD # 6 count:         9 old count:         9 dt:      3.43 s  HEC rate:      2.62 Hz

23:20 Check online data ok (R1_642) see attachment 15

23:54  BigRips and BRIKEN stop their runs
       AIDA on file R1_652

*************June 1st********** 

00:03  BRIKEN start run 47
       BigRIPS start run 1058
       AIDA on file R1_654
   
       BigRIPS not sending synchronizing pulse

00:09  BigRIPS and BRIKEN stop their run
  622   Thu Jun 1 16:06:03 2017 NNFriday 2 June 00:00-08:00
00:35   Beam is on
        current AIDA file R1_996

00:36   BRIKEN start run 72
        BigRIPS start run 1083
        AIDA file RIBF127R1/R1_996

00:55   Beam is off but DAQ of BRIKEN and BigRIPS are still running)
        expecting it will be back within 10 minutes
        AIDA file R1_1001

00:57   Analysis of file RIBF127R1/R1_1000 - dead time < 0.4% - see attachment 1

01:03   Beam is on
        DAQ is running continuously

01:15   statistics normal
        system wide checks ok 
        leakage current and bias ok see attachment 2
        merger and tapeserver ok

01:25   BigRIPS and BRIKEN stop their runs
        current AIDA run R1_1007

01:26   BRIKEN start run 73
        BigRIPS start run 1084
        AIDA on file R1_1008

01:36   FEE temperature is normal see attachment 3

02:22   BigRIPS and BRIKEN stop their runs
        current AIDA run R1_1021

02:23   high energy correlation between x and y attachment 4
        AIDA run R1_1021

02:26   BRIKEN start run 74
        BigRIPS start run 1085
        AIDA on file R1_1023 

03:00   System wide checks all ok      
        FEE temperatures ok - attachment 5
        Good event statistics - attachment 6
        Merger and tape server still running - attachment 7

03:06   Leakages and bias ok - attachment 8

03:09   Beam is OFF

03:11   BigRIPS and BRIKEN stop their runs
        current AIDA run R1_1033

04:10   Beam is still OFF 
        Investigation is still going on, on the ion source. 
        (Ion source were getting down more and more frequently before)

04:49   FEE's temperature normal
        statistics normal
        system wide checks ok 
        leakage current and bias ok 
        merger and tapeserver ok
        (waiting beam) 

06:01   Beam is ON
        AIDA run R1_1069

06:02   BRIKEN start run 75
        BigRIPS start run 1086
        AIDA on file R1_1070

06:08   FEE's temperature normal
        statistics normal
        system wide checks ok 
        leakage current and bias ok see attachment 9 
        merger and tapeserver ok

06:20   Analysis of file RIBF127R1/R1_1072 - dead time < 0.6% (most of the FEE cards have 0.0%) - see attachment 10

07:01   high energy correlation between x and y attachment 11
        AIDA run R1_1084

07:02   BigRIPS and BRIKEN stop their runs
        current AIDA run R1_1084

07:04   BRIKEN start run 76
        BigRIPS start run 1087
        AIDA on file R1_1085

07:16 per DSSSD rates file RIBF127R1/R1_1086
 *** DSSSD # 1 count:     92842 old count:     41280 dt:      1.05 s  LEC rate:  49071.92 Hz
 *** DSSSD # 2 count:    124879 old count:     56250 dt:      1.05 s  LEC rate:  65314.71 Hz
 *** DSSSD # 3 count:     44779 old count:     19466 dt:      1.05 s  LEC rate:  24090.56 Hz
 *** DSSSD # 4 count:     37971 old count:     18208 dt:      1.05 s  LEC rate:  18808.59 Hz
 *** DSSSD # 5 count:     15612 old count:      7434 dt:      1.05 s  LEC rate:   7783.06 Hz
 *** DSSSD # 6 count:     31207 old count:     14708 dt:      1.05 s  LEC rate:  15702.22 Hz
 *** DSSSD # 1 count:        27 old count:        11 dt:      1.05 s  HEC rate:     15.23 Hz
 *** DSSSD # 2 count:        89 old count:        43 dt:      1.05 s  HEC rate:     43.78 Hz
 *** DSSSD # 3 count:        82 old count:        44 dt:      1.05 s  HEC rate:     36.16 Hz
 *** DSSSD # 4 count:        65 old count:        32 dt:      1.05 s  HEC rate:     31.41 Hz
 *** DSSSD # 5 count:        29 old count:        17 dt:      1.05 s  HEC rate:     11.42 Hz
 *** DSSSD # 6 count:         6 old count:         3 dt:      1.05 s  HEC rate:      2.86 Hz

07:22   FEE's temperature normal - see attachment 12
        statistics normal - see attachment 13
        system wide checks ok 
        leakage current and bias ok
        merger and tapeserver ok - see attachment 14
  940   Thu Dec 14 10:53:27 2023 NH, MP, CC, GASnout Removed
Snout removed from S4

All detectors removed

BB7 taken to lab
bPlastic taken to testing hall
AIDA BB18 left in box under AIDA-3 with other DSSSDs

Snout on green table in rear of Messhütte
  933   Thu Dec 7 17:30:36 2023 NH, CC, VP, TDThursday 7 December
Stack re-assembled - upstream to downstream

- 'upstream' bPlast
- no spacer
- black cloth optical screen on steel frame ( c. 1.5cm diamond hole lower left side in direction of beam )
- std 9mm spacer
- MSL type BB18(DS)-1000 24cm x 8cm 3208-3/3208-21/3208-22
- std 9mm spacer
- MSL type BB7(DS)-1000 3542-13 ( approx central wrt BB18 )

bPlast cables screened 3M 1245 + Kapton film + drain wire
 bPlast cables currently floating
 bPlast driver PCBs disconnected

FEE64 aida06 adaptor PCB currently disconnected

ASIC settings 2023Nov16-18.55.20

BNC PB-5 pulser - not connected

DSSSD bias -150V -5.13uA - attachment 1

FEE64 temperatures Ok - attachment 2

All system wide checks OK

ADC data item stats OK - attachment 3
 Note *very* low rate in aida02 ( n+n Ohmic side )

p+n 1.8.W spectra - 20 us FSR - attachments 4 & 5
 
per FEE64 rate spectra - attachment 6

n+n 1.8.W spectra - 20us FSR - attachments 6 & 7


AIDA To Do

replace aida04
pulser walkthrough
  934   Fri Dec 8 11:32:44 2023 NH, CC, VP, TDFriday 8 December
Change n+n FEE64 aida04 d8:80:39:41:f6:b7
 asic #1 faulty

aida04 MAC from d8:80:39:41:f6:b7 to d8:80:39:41:ba:2b

restart dhcpd ( systemctl restart dhcpd )


DSSSD bias -150V -5.17uA - attachment 1

FEE64 temperatures OK - attachment 2

All system wide checks OK

ADC data item stats - attachment 3
 High rates observed in all FEE64s *except* aida01 & aida04 => aida04 asics #1-4 OK
 CC/VP have commenced cabling bPlast - will await completion of install to review noise
 

n+n 1.8.W spectra - 20 us FSR - attachments 5
 
per FEE64 rate spectra - attachment 4



18:20 AIDA noise status test

      bPlast - cabling complete, power on - all sides 
      BB7 Mesystec preamps connected, power off, no detector HV

DSSSD bias -150V -5.355uA - attachment 6

FEE64 temperatures OK - attachment 7

All system wide checks OK

ADC data item stats - attachment 8
 Rates c. 10-20k mostly dominated by a few 'hot' channels

per FEE64 rate spectra - attachments 9 & 10

p+n 1.8.W spectra - 20us FSR - attachment 11
 bPlast using 152Eu source for test - signal observed aida01 3.8.W may be recoil electron from Compton event
n+n 1.8.W spectra - 20 us FSR - attachment 12

Some photos of bPlast & BB& preamp/cabling attached

re-bPlast note that
cables screened 3M 1245 + Kpaton + drain wire -> drain wires *not* connected to ground
PSU ch 4 not ground referenced
 
  925   Tue Nov 21 13:56:59 2023 NH, CC, HA, MP, AM, VPTuesday 21 November
Connect the BB7 on top of the snout to the former aida05 (FEE above aida01)
Also remove copper busbar that is unused

Power on AIDA... rates terrible (attachment 1)

Reground AIDA stand to platform base ... small improvement but nothng major

Decide to power OFF, recheck all connections, aida02 ERNI maybe a bit loose, otherwise all good.
Remove BB7 to try to restore status quo ante

Power on again and rates much improved (attachments 2 & 3)
Looks similar to attachment 44 on Aida test 17/11/23
-> Back to status quo?


15:05 : BB7 put back on the snout and connected (ground + HV)
No significant change has been noticed (attachments 4 & 5)

Attach cables 14 to FEE that BB7 is connected - then will configure DHCP for aida09

Start up aida, configure as before. AIDA09 appears but is not configured (ASIC settings just copied from aida08 for now)

Rates on aida look OK still (attachment 6)

HV (attachment 7)

Temps (attachment 8)
  911   Mon Oct 23 10:52:06 2023 NH, CCAIDA test
Started AIDA at 11:50, writing to disk: file BG18OCT2/R3, stopped around 3 pm

pict1: HV supply
pict2: temperature
pict3: spectrum in stat, layout2
pict4: statistics
  912   Mon Oct 23 14:08:06 2023 NH, CCAIDA test
Started AIDA at 3:05pm, writing to disk: file BG18OCT2/R4, stopped 18.30

pict1: HV supply
pict2: temperature
pict3: spectrum in stat, layout2
pict4: statistics

pict5: sum spectra at 18:20 (3.4 hours)

system power off and unbiased
  910   Thu Oct 19 10:39:20 2023 NHThursday 19 October
Water Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE 

One USB Hub for the FEE64 TTYs was unplugged on cable tray, replugged in
 (may fix Pi_Monitor)

Bias DSSD (Ch 3) 
Leakage current stays at 17 uA during ramp up. At 150 V it quickly drops back to 6 uA
 Fig 1

Current FEE mapping
p+n aida09 aida01 aida10
    aida11 aida03 aida12

n+n aida02 aida04

Unused aida06 aida08

Due to merger need 8 FEEs 1-8 to merge properly will temporarily renumber for 1 DSSSD test
 - Will revert to this numbering for experiment!

Power up with unchanged configuration to test

Fee Temps OK Figure 2

Start DAQ at 0x64 threshold (1 MeV)
 Most channels 0 rate (expected)
 ASIC01 of AIDA4 very hot 
 2 channels in aida10 very hot
 Figure 3

Pulser OFF and only connected to aida11 aida03 aida12
 LOCAL operation at present 10V/10X level, positive tail, 25 Hz

STOP and Power off to renumber 

New mapping for now:

p+n aida05 aida01 aida06
    aida07 aida03 aida08

n+n aida02 aida04

aida09 ---> aida05
aida10 ---> aida06
aida11 ---> aida07
aida12 ---> aida08

-

Backup dhcpd.conf -> dhcpd.conf231019
Update to only first 8 fees
only turn on Relay 1

Update MIDAS Tcl
/MIDAS/config/TclHttpd/aidas-gsi@8015/startup.Tcl
list aida01... aida08

new folder
/home/npg/LayOut/GSI_triple_test_renumber

copy to /tmp

-

Reboot MIDAS and Power on Relay 1
Power OFF
Reboot dhcp!

Anydesk Connection Lost??

Make new DB key 2023Oct19-13.46.30
Copy aida01/CONTENTS (p+n) to aida06 and aida08 
Cannot update Options http://localhost:8015/AIDA/Options/Options.tml ? Error 500
Figure 4
Load settings manually and check-load ASIC
TODO: Manually change files, or?

GO

ADC items + rates figures 5, 6

Restart Merger
xfer Links (bad)
Netvar -> Inquire Registers
NetVar.MERGE.RunOptions WRITE 1

Merger now shows xfer Links => Merger
Merger GO

Open file BG18OCT23  R1

STOP DAQ
Data Xfer #1 Enable
GO DAQ

See merger links all GSI_triple_test_renumber
Enable output to data storage
xfer Links => Merger => storage

See tape rate: 3 MB/s (!)

Also start MBS on x86l-119 (new AIDA FDR) and try MBS relay
rate seen in MBS

Figure 8 - Accumulated statistics for ca 3 hours
 Figs 9, 10 - ADC spectra

System turned off and DSSSD biased down for end of work day, due to water issue
  915   Mon Nov 6 17:30:44 2023 NHAida Alpha Analysis
Analysis of tape folder /TapeData/BG18OCT23

Using Go4 https://github.com/cej25/DESPEC_NOV23

Figure 1: Hit pattern (XY)
Figure 2: Energy 1D Spectra, alpha peaks visible
Figure 3: Energy X vs Energy Y
Figure 4: 1D Strip (0-386 = X 0-386, 386-512 = Y 0-128) and Energy

Some gaps at 112-114, 121-128 = aida05 
Hot channels at 368, 381, 382 = aida06 (high rate seen)
Gap at 435-450 = aida04 (ASIC#4 which is faulty)

Generally 1-10 counts per strip, 1 ch wide gaps may be statistics or issues
  926   Wed Nov 22 13:44:36 2023 NHReport - Cannot change per-ASIC Settings
On ASIC settings page trynig to change the settings for one ASIC (e.g. ASIC1 of aida09) seems to cause all 4 ASIC settings to change

1. Ensure act on all FEEs and act on all ASICs unticked
2. Change aida09 asic1 low_ref to 0x1 
3: Change to aida09 asic4
4: aida09 asic4 low_ref also changed to 0x1 
  927   Wed Nov 22 14:52:43 2023 NHAIDA Pulser Calibration
Connect pulser to all p+n FEEs

Turn on pulser, 100 Hz (attachment 3 for settings), rates OK (attachment 1)

1 minute at 10V.. 9V.. 1V (5X atten) 

Most FEEs OK (attachment 2), aida07 and aida08 weird?

FILE: PULSER21NOV23/R4

Check in S4, one pulser LEMO not in fully, reseat and try again

File R5... much better! (attachment 4)
  929   Thu Nov 23 10:00:16 2023 NHReport - Cannot change per-ASIC Settings
> On ASIC settings page trynig to change the settings for one ASIC (e.g. ASIC1 of aida09) seems to cause all 4 ASIC settings to change
> 
> 1. Ensure act on all FEEs and act on all ASICs unticked
> 2. Change aida09 asic1 low_ref to 0x1 
> 3: Change to aida09 asic4
> 4: aida09 asic4 low_ref also changed to 0x1 

Variable dumps for ASIC and ASIC4
  930   Fri Nov 24 10:36:06 2023 NHFriday 24 November
Pulser LEMOs removed from p+n fees
Pulser connected to n+n fees: aida02 and aida04 
BNC PB-5 Polarity --> NEGATIVE

HV and FEE power up

Rates look similar to usual (Attachments 1 and 2)

Turn on pulser, see them in n+n spectra as expected  (attachment 3) 

Pulser run R6

See peaks in ADC spectra (attachment 4)

Remove pulser from aida02, left on aida04 with 50Ohm terminator 

AIDA powered off, HV off
ELOG V3.1.3-7933898