| ID |
Date |
Author |
Subject |
Text |
 |
|
777
|
Mon Nov 12 14:51:44 2018 |
OH | Tuesday 13 November 00:00 - 08:00 | 00:00 AIDA currently on file R5_38
BRIKEN on file 181112_2321_165Pm_019.dlt
(AIDA file at start R5_33)
|
12x |
|
786
|
Thu Nov 15 06:52:09 2018 |
OH | Thursday 15th November 16:00 - 24:00 | 15:51 DAQ continues - AIDA file RIBF148/R5_664
165Pm BigRIPS setting + 2.8mm Al degrader
|
11x |
|
792
|
Tue Mar 26 14:02:59 2019 |
OH | Inventory to be shipped back | Inventory is currently packaged up under the
AIDA desk in B3F
|
|
|
641
|
Wed Jun 7 00:10:24 2017 |
NN, TD | Wednesday 7 June 08:00 - 16:00 | 08:12 Analysis of file RIBF128/R6_438 -
zero timewarps, four MBS timewarps - see
attachment 1
|
30x |
|
645
|
Thu Jun 8 08:11:39 2017 |
NN, PV | Thursday 8 June 16:00 - 24:00 (evening shift) | 16:13 DAQ still running
16:34 BigRIPS and BRIKEN stop their DAQ
|
22x |
|
631
|
Sun Jun 4 16:00:49 2017 |
NN, OH | Monday 5 June 00:00 to 08:00 | 23:59 BigRIPS and Briken stop their DAQ
AIDA run file R2_245
|
19x |
|
617
|
Wed May 31 08:00:26 2017 |
NN, CB | Wednesday 31 May 16:00 - 24:00 | 16:30 Check online data ok (R1_533) see attachment
1
|
15x |
|
622
|
Thu Jun 1 16:06:03 2017 |
NN | Friday 2 June 00:00-08:00 | 00:35 Beam is on
current AIDA file R1_996
|
14x |
|
940
|
Thu Dec 14 10:53:27 2023 |
NH, MP, CC, GA | Snout Removed | Snout removed from S4
All detectors removed
|
|
|
933
|
Thu Dec 7 17:30:36 2023 |
NH, CC, VP, TD | Thursday 7 December |
Stack re-assembled - upstream to downstream
|
8x |
|
934
|
Fri Dec 8 11:32:44 2023 |
NH, CC, VP, TD | Friday 8 December |
Change n+n FEE64 aida04 d8:80:39:41:f6:b7
asic #1 faulty
|
18x |
|
925
|
Tue Nov 21 13:56:59 2023 |
NH, CC, HA, MP, AM, VP | Tuesday 21 November | Connect the BB7 on top of the snout to the
former aida05 (FEE above aida01)
Also remove copper busbar that is unused
|
8x |
|
911
|
Mon Oct 23 10:52:06 2023 |
NH, CC | AIDA test | Started AIDA at 11:50, writing to disk: file
BG18OCT2/R3, stopped around 3 pm
|
   |
|
912
|
Mon Oct 23 14:08:06 2023 |
NH, CC | AIDA test | Started AIDA at 3:05pm, writing to disk: file
BG18OCT2/R4, stopped 18.30
|
    |
|
910
|
Thu Oct 19 10:39:20 2023 |
NH | Thursday 19 October | Water Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE
|
10x |
|
915
|
Mon Nov 6 17:30:44 2023 |
NH | Aida Alpha Analysis | Analysis of tape folder /TapeData/BG18OCT23
Using Go4 https://github.com/cej25/DESPEC_NOV23
|
   |
|
926
|
Wed Nov 22 13:44:36 2023 |
NH | Report - Cannot change per-ASIC Settings | On ASIC settings page trynig to change the
settings for one ASIC (e.g. ASIC1 of aida09)
seems to cause all 4 ASIC settings to change
|
|
|
927
|
Wed Nov 22 14:52:43 2023 |
NH | AIDA Pulser Calibration | Connect pulser to all p+n FEEs
Turn on pulser, 100 Hz (attachment 3 for |
   |
|
929
|
Thu Nov 23 10:00:16 2023 |
NH | Report - Cannot change per-ASIC Settings | > On ASIC settings page trynig to change the
settings for one ASIC (e.g. ASIC1 of aida09)
seems to cause all 4 ASIC settings to change
|
   |
|
930
|
Fri Nov 24 10:36:06 2023 |
NH | Friday 24 November | Pulser LEMOs removed from p+n fees
Pulser connected to n+n fees: aida02 and
aida04
|
   |